中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/94572
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41638774      線上人數 : 1760
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/94572


    題名: 貨品前置交期縮短探討;Discuss the shortening lead time of goods
    作者: 呂瑋珊;Lu, Wei-Shan
    貢獻者: 工業管理研究所在職專班
    關鍵詞: 前置交期;流程管理;物料策略;工單管理;5W1H;PDCA
    日期: 2024-07-09
    上傳時間: 2024-10-09 15:17:09 (UTC+8)
    出版者: 國立中央大學
    摘要: 現今是國際競爭的時代,快速供應出貨搶商機、搶市場、滿足客戶少樣多樣的需求,已成為許多產業公司工廠必備的條件之一,公司工廠運作要像齒輪般完美的運作從接單開始、工單開立、物料需求運算、轉採購單、物料進貨、工單備料、生產製造、出貨等流程上下串連,並須將中間的所有疑難雜症異常排除,要持續不斷的優化所有流程時間。
    本文透過實際個案,以 5W1H 思考方法,從流程面開始再向下切分到檢視執行面運作,將從頭到尾的流程都順過一遍,找尋問題並予以分析,展開PDCA 循環改善,其中以貨品 A 實例展開物料清單查其影響貨品交期的關鍵因素,對於物料的策略,也隨著不同的前置交期與採購的談判,有不同的步驟與方法。當中也檢視到工單時間的重要性,以及前後順序工單正確的影響性,關係著公司存貨物料的運用。
    最終實際研究個案的優化成效,成功縮減超過 50%的時間,達到目前設定的目標值。客戶可能不僅限於此,未來還能做的、還需要做的還有很多,必須要不停歇的不斷持續改善,以因應快速變遷的高資訊科技產業時代。
    ;In today′s era of international competition, the rapid supply and delivery of goods to seize business opportunities, capture markets, and meet the difference goods of customers have become essential conditions for many industrial companies. The operation of company factories must function seamlessly, like gears, from order reception, work order issuance, material demand calculation, rocurement order conversion, material procurement, work order preparation, production manufacturing, to shipment. All these processes need to be interconnected, and all difficulties and anomalies in between must be continuously resolved, while constantly optimizing the time of all processes.

    This article employs the "5W1H" method through practical cases, starting from the perspective of processes and then delving into execution. It systematically reviews the entire process, identifying and analyzing problems, and initiating the PDCA cycle for improvement. Using Product A as an example, it investigates the key factors affecting delivery lead time by examining the bill of materials. Different strategies for materials are explored based on varying lead times and procurement negotiations. The importance of work order timing and the correct sequencing of work orders are also evaluated, impacting the utilization of company inventory.

    Ultimately, through the optimization of the actual case study, a reduction of over 50% lead time, meeting the set objectives. However, the scope for improvement may extend beyond this, as there will always be more to do and improve upon in order to adapt to the rapidly changing landscape of the high-information technology industry.
    顯示於類別:[Executive Master of Industrial Management] Electronic Thesis & Dissertation

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML34檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明