中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/96650
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 82005/82005 (100%)
Visitors : 53241869      Online Users : 1943
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: https://ir.lib.ncu.edu.tw/handle/987654321/96650


    Title: 以分支定界法極小化具層級與雙目標之零工式排程問題;A Branch-And-Bound Algorithm for Solving a Job Shop Scheduling Problem with Layers and Dual Criteria
    Authors: 沈國基
    Contributors: 國立中央大學工業管理研究所
    Keywords: 零工式排程;分支定界法;雙目標優化;分離弧線圖;柏拉圖前緣;Job shop scheduling problem;Branch and bound algorithm;Bi-objective optimization;Disjunctive graph;Pareto front
    Date: 2025-07-31
    Issue Date: 2025-08-07 16:44:04 (UTC+8)
    Publisher: 國家科學及技術委員會(本會)
    Abstract: 本計畫的問題定義來自於台灣某一半導體製造公司所面對的每天排程問題,其短期(例如:每天)的排程目標須完成某些wafer層級的製造,並以此來監督其短期的進度,長期目標則以極大化其製造資源的使用;學術上,零工式排程問題之分支定界法傳統上大多以分離弧線圖來呈現Search tree上之節點,本研究須將其延伸至能表達特定wafer層級之問題;對於Branching scheme,為了能同時因應本研究兩目標,本研究將提出能同時照顧到本研究雙目標的有效分枝方法;在本問題的特性與新的分離弧線圖下,對Total tardiness目標與Makespan目標,本研界將延伸已有研究之成果,提出新的lower bound/upper bound,以為本研究分支定界法的使用。本研究之成果會對半導體製造實務與排程學術的推展有相當的貢獻。
    Relation: 財團法人國家實驗研究院科技政策研究與資訊中心
    Appears in Collections:[Graduate Institute of Industrial Management] Research Project

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML7View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明