    題名: Optimization of earth recycling and dump truck dispatching
    作者: 顏上堯;Chu, James C.;Yan, Shangyao;Chen, Kuan-Lin
    貢獻者: 工學院土木工程學系
    關鍵詞: Algorithms;Construction industry;Dump truck dispatching;Dump trucks;Earth;Earth recycling;Heuristic algorithm;Mathematical models;Multiple commodity network flow problem;Network flow problem;Networks;Optimization;Optimization algorithms;Recycling;Schedules;Studies;Time–space network;Transportation
    日期: 2012-02-01
    上傳時間: 2026-04-21 13:26:42 (UTC+8)
    出版者: Elsevier Ltd.;New York: Elsevier Ltd
    摘要: 摘要: ► A model to simultaneously plan earth recycling and truck dispatching is developed. ► Actual operating conditions are successfully considered. ► A heuristic algorithm using problem decomposition and relaxation is proposed to efficiently solve the model. ► The error gap between the exact method and the heuristic method is only 0.5% in the case study. ► Recycling earth materials increases profitability for contractors and reduces environmental impact. Earth is one of the major materials used in the construction industry. Recycling earth reduces the cost of waste disposal and generates revenue for contractors. More importantly, utilizing reusable materials minimizes construction waste and reduces the environmental impact. One of the key requirements to ensure the effectiveness of earth recycling is a well-designed schedule for the movement of the dump trucks that transport earth materials to their destinations in a timely fashion. Therefore, in this study a mathematical model is developed to plan earth recycling and dump truck dispatching simultaneously from a system optimization perspective. The time–space network technique is adopted to formulate the dump truck and earth material flows in the dimensions of time and space. The model is formulated as a special multiple commodity network flow problem, which is characterized as NP-hard. To solve the real-world large-scale problems in a reasonable time, a heuristic algorithm using problem decomposition and relaxation is proposed. To suitably evaluate the model and algorithm, a case study is performed using actual parameters obtained from a large construction project in Taiwan and statistical data gleaned from government reports. The test results show that the problem can be efficiently solved and the error gap is within 0.5%. The scenario analysis indicates that the proposed framework could also be used for different problem scales. The model, coupled with the solution algorithm, has potential to serve as a planning tool for construction contractors to design optimal schedules for recycling earth materials and dispatching trucks.
    出版者: New York: Elsevier Ltd
    出版日期: 2012-02-01
    出處: Computers & Industrial Engineering, 2012-02, Vol.62 (1), p.108-118
    資源來源: Elsevier ScienceDirect Journals Complete
    版權: 2011 Elsevier Ltd
    版權: Copyright Pergamon Press Inc. Feb 2012
    識別號: ISSN: 0360-8352
    識別號: EISSN: 1879-0550
    識別號: DOI: 10.1016/j.cie.2011.08.022
    識別號: CODEN: CINDDL
    顯示於類別:[土木工程學系 ] 期刊論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML16檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明