中大學術數位典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/99678
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 94201/94201 (100%)
Visitors : 81643699      Online Users : 6279
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: https://ir.lib.ncu.edu.tw/handle/987654321/99678


    Title: Critical path effect based delay analysis method for construction projects
    Authors: 楊智斌;Yang, Jyh-Bin;Kao, Chih-Kuei
    Contributors: 工學院土木工程學系
    Keywords: Bauwirtschaft;Claim;Comparative analysis;Construction;Construction industry;Construction project;Critical path;Delay;Delay analysis;Effectiveness studies;Liability;Methods;Project management;Projection;Projektmanagement;Schedule analysis;Schedules;Scheduling-Verfahren;Software;Subjective assessment;Warteschlangentheorie;Windows (computer programs)
    Date: 2012-04-01
    Issue Date: 2026-04-21 13:27:06 (UTC+8)
    Publisher: Elsevier BV;Kidlington: Elsevier Ltd
    Abstract: 摘要: Assessing schedule delay's impact on total project duration to distribute delay liability remains a controversy. None of existing delay analysis methods is perfect because including an element of assumptions, subjective assessment and theoretical projection. Windows-based delay analysis methods are excellent in identifying and measuring construction schedule delays. Based on a previous study identifying potential problems in available windows-based delay analysis methods, this study proposes an innovative windows-based delay analysis method, called the effect-based delay analysis method (the EDAM method). The EDAM method performs delay analysis using extracted windows and determines delay impacts by considering the effects of delays on the critical path(s). According to its application to hypothetical cases and comparisons with other methods, the EDAM method is efficient in delay analysis and effective in solving concurrent delays and determining schedule shortened. The proposed EDAM method is a good alternative for schedule delay analysis for construction projects. ► EDAM method considers critical path effects in delay analysis. ► EDAM method has a systematic approach for delay analysis stably and efficiently. ► EDAM method is effective in determining concurrent delays and schedule shortened. ► EDAM method has an approach for liability distribution in concurrent delays.
    出版者: Kidlington: Elsevier Ltd
    出版日期: 2012-04-01
    出處: International journal of project management, 2012-04, Vol.30 (3), p.385-397
    資源來源: Elsevier ScienceDirect Journals Complete
    版權: 2011 Elsevier Ltd and IPMA
    版權: Copyright Elsevier Science Ltd. Apr 2012
    識別號: ISSN: 0263-7863
    識別號: EISSN: 1873-4634
    識別號: DOI: 10.1016/j.ijproman.2011.06.003
    Appears in Collections:[Department of Civil Engineering] journal & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML11View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明