中大學術數位典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/99845
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 94201/94201 (100%)
Visitors : 81728650      Online Users : 1547
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: https://ir.lib.ncu.edu.tw/handle/987654321/99845


    Title: Developing computer-based schedule delay analysis methods based on information flow analysis: A case study
    Authors: 姚乃嘉;Tsai, Ming-Kuan;Yang, Jyh-Bin;Yau, Nie-Jia
    Contributors: 工學院土木工程學系
    Keywords: analytical techniques;claims management;Classification;Construction;construction dispute;Delay;Engineering research;Information flow;Information theory;Liability;Management;programming technique;Project management;project management software;schedule delay;Schedules;Scheduling (Management)
    Date: 2013-12-01
    Issue Date: 2026-04-21 13:37:55 (UTC+8)
    Publisher: Vilnius Gediminas Technical University;Taylor & Francis
    Abstract: 摘要: Schedule analysts often resolve diverse schedule delay problems in construction projects based on their subjective experiences. Although various process-based and mathematical-model schedule delay analysis methods are available for effective schedule delay analysis, these methods require time-consuming manual operation. The use of computer-based schedule delay analysis methods seems to be a solution. However, schedule analysts still have difficulty developing computer-based schedule delay analysis methods. Therefore, this study applies information flow analysis to classify the necessary work to develop computer-based schedule delay analysis methods. In contrast to numerous studies that focus only on computerizing a process-based or a mathematical-model schedule delay analysis method, this study constructs a computer-based method that integrates two process-based schedule delay analysis methods simultaneously. In a tested case study, the delay liability for the project owner and contractor was classified successfully. Importantly, this study provides a useful reference for similar applications in project management.
    其他題名: JCEM
    出版者: Taylor & Francis
    出版日期: 2013-12-01
    出處: Journal of civil engineering and management, 2013-12, Vol.19 (6), p.823-835
    資源來源: DOAJ Directory of Open Access Journals
    版權: Copyright © 2013 Vilnius Gediminas Technical University (VGTU) Press 2013
    版權: Copyright (c) 2013 The Author(s). Published by Vilnius Gediminas Technical University.
    版權: COPYRIGHT 2013 Vilnius Gediminas Technical University
    識別號: ISSN: 1392-3730
    識別號: ISSN: 1822-3605
    識別號: EISSN: 1822-3605
    識別號: DOI: 10.3846/13923730.2013.801901
    Appears in Collections:[Department of Civil Engineering] journal & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML11View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明