English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 94201/94201 (100%)
造訪人次 : 81699050      線上人數 : 3465
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: https://ir.lib.ncu.edu.tw/handle/987654321/99934


    題名: Improving efficiency for post-disaster transitional housing in Indonesia: An exploratory case study
    作者: 姚乃嘉;Yau, Nie-Jia;Tsai, Ming-Kuan;Nurma Yulita, Eryani
    貢獻者: 工學院土木工程學系
    關鍵詞: Disaster risk management;Environmental management;Public policy & environmental management
    日期: 2014-01-01
    上傳時間: 2026-04-21 13:41:56 (UTC+8)
    出版者: Emerald Group Publishing Ltd.;Emerald Group Publishing Limited
    摘要: 摘要: Purpose – Natural hazards occur frequently in Indonesia. When post-disaster recovery is prolonged and complicated, it is necessary to provide accommodations for homeless refugees in disaster areas. Since a transitional housing solution includes planning, design and execution phases, the design phase implements the decisions made in the planning phase and also affects the results of the execution phase. Therefore, the purpose of this paper is to assist communities to effectively deal with various processes during the design phase involving transitional housing solutions. Design/methodology/approach – Based on eight factors associated with “building back better” and ten principles of transitional housing, the paper identified three problems in the design phase: inappropriate selection of settlement sites, improper representation of housing facilities and ineffective scheduling of construction projects. To resolve these problems, this study integrated a geographic information system (GIS), three-dimensional (3D) building models and construction project management tools to assess settlement sites, confirm housing facilities and configure construction projects, respectively. Findings – After this study tested conventional methods (e.g. paper-based maps, drawings, reports) and the proposed approach, the results revealed that communities can appropriately determine settlement sites based on the GIS. The 3D building models enabled the communities to understand the external and internal layouts of housing facilities. Through construction project management, the communities could consider construction activities immediately when preparing the execution phase for transitional housing solutions. Originality/value – This study offers a useful reference for similar applications in post-disaster reconstruction and management.
    出版者: Emerald Group Publishing Limited
    出版日期: 2014-04-01
    出處: Disaster prevention and management, 2014-04, Vol.23 (2), p.157-174
    資源來源: Healthcare Administration Database (Proquest)
    版權: Emerald Group Publishing Limited
    識別號: ISSN: 0965-3562
    識別號: DOI: 10.1108/DPM-04-2013-0071
    顯示於類別:[土木工程學系 ] 期刊論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML8檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明