中大學術數位典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/99945
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 94274/94274 (100%)
造访人次 : 82917843      在线人数 : 1894
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: https://ir.lib.ncu.edu.tw/handle/987654321/99945


    题名: Incorporating contractual arrangements in production planning
    作者: 王啟泰;Milne, R. John;Wang, Chi-Tai;Denton, Brian T.;Fordyce, Kenneth
    贡献者: 管理學院工業管理研究所
    关键词: Contracts;Delivery contracts;Foundries;Foundry;Linear programming;Mathematical models;Mathematical problems;Operations research;Positioning;Production planning;Semiconductor manufacturing;Semiconductors;Studies;Supply chain management;Supply chain planning;Supply chains;Wafers
    日期: 2015-01-01
    上传时间: 2026-04-21 13:42:34 (UTC+8)
    出版者: Elsevier Ltd.;New York: Elsevier Ltd
    摘要: 摘要: The semiconductor supply chain is full of complexities outside of the traditional order, make/buy, and deliver process. One critical challenge occurs when part of a semiconductor fabricator׳s capacity is allocated to produce wafers designed by and provided to fabless companies. In this situation, linked customer requirements are expressed simultaneously at both the semiconductor level of the supply chain and the finished goods level. As a result of the complex contractual relationships between the foundry and the fabless company, a new solution model and method is needed to determine a production plan. In our approach, two linear programming (LP) models are solved sequentially where the results of a first LP are post-processed into input for a second LP. We describe the application of this approach for two different types of contracts where the goal is maintaining as much common modeling as possible while ensuring the unique features of each contract are covered. For one type of contract, the first LP model determines the minimum quantities of wafers required to be released into the fab to meet the contractual obligation; these required starts are added as a constraint for the second LP model. For the other type of contract, the first LP determines production at one level of the bills of materials and feeds these outputs into a second LP that determines production for later stages of manufacture.
    出版者: New York: Elsevier Ltd
    出版日期: 2015-01
    出處: Computers & operations research, 2015-01, Vol.53, p.353-363
    版權: 2014 Elsevier Ltd
    版權: Copyright Pergamon Press Inc. Jan 2015
    識別號: ISSN: 0305-0548
    識別號: EISSN: 1873-765X
    識別號: EISSN: 0305-0548
    識別號: DOI: 10.1016/j.cor.2014.03.023
    識別號: CODEN: CMORAP
    显示于类别:[工業管理研究所 ] 期刊論文

    文件中的档案:

    档案 描述 大小格式浏览次数
    index.html0KbHTML31检视/开启


    在NCUIR中所有的数据项都受到原著作权保护.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明