English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 94274/94274 (100%)
造訪人次 : 82906640      線上人數 : 2392
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: https://ir.lib.ncu.edu.tw/handle/987654321/99962


    題名: Logistical support scheduling under stochastic travel times given an emergency repair work schedule
    作者: 顏上堯;Yan, Shangyao;Lin, Chih-Kang;Chen, Sheng-Yu
    貢獻者: 工學院土木工程學系
    關鍵詞: Emergency repair work schedule;Heuristic;Integer programming;Logistical support scheduling;Logistics;Network flow problem;Production scheduling;Stochastic models;Stochastic travel time;Studies;Time–space network;Transportation problem (Operations research);Travel
    日期: 2014-01-01
    上傳時間: 2026-04-21 13:43:17 (UTC+8)
    出版者: Elsevier Ltd.;New York: Elsevier Ltd
    摘要: 摘要: •A stochastic model is developed for optimal scheduling of logistical support.•A time–space network flow technique is adopted to create the stochastic model.•A heuristic algorithm is developed to solve the stochastic model.•An evaluation method is developed to evaluate the performance of the models. Stochastic factors during the operational stage could have a significant influence on the planning results of logistical support scheduling for emergency roadway repair work. An optimal plan might therefore lose its optimality when applied in real world operations where stochastic disturbances occur. In this study we employ network flow techniques to construct a logistical support scheduling model under stochastic travel times. The concept of time inconsistency is also proposed for precisely estimating the impact of stochastic disturbances arising from variations in vehicle trip travel times during the planning stage. The objective of the model is to minimize the total operating cost with an unanticipated penalty cost for logistical support under stochastic traveling times in short term operations, based on an emergency repair work schedule, subject to related operating constraints. This model is formulated as a mixed-integer multiple-commodity network flow problem and is characterized as NP-hard. To solve the problem efficiently, a heuristic algorithm, based on problem decomposition and variable fixing techniques, is proposed. A simulation-based evaluation method is also presented to evaluate the schedules obtained using the manual method, the deterministic model and the stochastic model in the operation stage. Computational tests are performed using data from Taiwan’s 1999 Chi-Chi earthquake. The preliminary test results demonstrate the potential usefulness of the proposed stochastic model and solution algorithm in actual practice.
    出版者: New York: Elsevier Ltd
    出版日期: 2014-01
    出處: Computers & industrial engineering, 2014-01, Vol.67, p.20-35
    資源來源: Elsevier ScienceDirect Journals
    版權: 2013 Elsevier Ltd
    版權: Copyright Pergamon Press Inc. Jan 2014
    識別號: ISSN: 0360-8352
    識別號: EISSN: 1879-0550
    識別號: DOI: 10.1016/j.cie.2013.10.007
    識別號: CODEN: CINDDL
    顯示於類別:[土木工程學系 ] 期刊論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML12檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明