<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>DSpace collection: 研究計畫</title>
    <link>https://ir.lib.ncu.edu.tw/handle/987654321/24133</link>
    <description />
    <textInput>
      <title>The collection's search engine</title>
      <description>Search the Channel</description>
      <name>s</name>
      <link>https://ir.lib.ncu.edu.tw/simple-search</link>
    </textInput>
    <item>
      <title>台灣中子散射實驗設施在澳洲實驗站反射儀之運作與管理計畫;Operation and Management of Taiwan Neutron Beam Facility - Reflectometer at Ansto, Australia</title>
      <link>https://ir.lib.ncu.edu.tw/handle/987654321/52685</link>
      <description>title: 台灣中子散射實驗設施在澳洲實驗站反射儀之運作與管理計畫;Operation and Management of Taiwan Neutron Beam Facility - Reflectometer at Ansto, Australia abstract: 此計畫主因國科會基於推動中子散射應用實驗，於 2005 年6 月8 日簽訂台澳中子束應用研究協議。依據該協議書，由國科會提供經費，經由中央大學李文獻教授所主持之中子散射設施建置計畫與運作推廣計畫，在位於澳洲雪梨附近的原子核科學與技術組織ANSTO，興建一部新一代冷中子三軸散射儀SIKA，完成後，台灣據而獲得一部儀器的70%使用時間，該儀器使用時間得分散於其他類型的中子散射儀。依規劃，澳洲核反應爐每年運行340 天，SIKA 運作後，台灣即可使用ANSTO 所運作的中子散射儀總共240 天之實驗時間，包括各類繞射儀、散射儀及反射儀等，提供國內各領域研究團隊使用。本個別計劃的任務在於協助推廣中子散射實驗中之反射儀實驗，藉由協助中子學會開設中子散射研習學校、輔助同步輻射中心的中子用戶會議、教導用戶從事中子反射實驗數據分析及協助用戶撰寫中子反射實驗申請計畫等，以發展出能有效運作的用戶安排計劃，並進一步在現場協助用戶安全及有效率地運作ANSTO 之中子反射儀PLATYPUS 且建立台灣的研究團隊，以期在三年計畫完成後，台灣中子束實驗設施SIKA 及ANSTO 所有之反射儀PLATYPUS 能被國內研究及產業團隊有效利用，從事尖端研究，並發展出適於國內研究生態的用戶計劃。除了推廣及協助中子反射儀之運作，主持人之科學研究亦可增加反射儀使用情況及累積更多實務經驗，藉由與國內各領域專家學者之合作，引導他們進入中子反射實驗之領域，將進而增加更多的台灣研究團隊。According to the Agreement “Memorandum of understanding between the Australian Commerce and Industry Office and the National Science Council of Taiwan for technical cooperation on neutron beam applications research”, signed on June 8, 2005, NSC is responsible to (1) provide funding and complete construction of a cold neutron triple-axis spectrometer (CNTAS) named as SIKA at the OPAL reactor of ANSTO, and (2) provide human resources at the level of 4 persons plus local administrative support for the operation of the CNTAS after commissioning. A 70% of one instrument time, which may be distributed over the full set of neutron beam instruments of ANSTO including diffractometers, spectometers and reflectometer, will then be allocated for the NSC related scientists. To fulfill and make the most of the Agreement, the integrated proposal aims to build up a “Taiwan neutron beam application station” at ANSTO for Taiwan community, and plans to execute the following projects: (1) manage the operation of SIKA and other instruments; (2) set up instrument scientist teams; and (3) run users’ programs to support neutron scattering experiments to be conducted on SIKA, and on all instruments of ANSTO. In this individual proposal, we focus on how to utilize the reflectometer (PLATYPUS) in ANSTO comprising three missions: (1) help scientist teams from Taiwan to use PLATYPUS safely and efficiently; (2) help scientist teams from Taiwan to write a good proposal to apply for beam time in PLATYPUS; and (3) teach scientists and students from Taiwan to analyze the data obtained from PLATYPUS experiments. In addition, to more understand the mechanisms of reflectometer, and gain more experiences on PLATYPUS, we will conduct some researches principally on the topic “Interfacial spin-structure in novel oxide superlattices and heterostructures” by using PLATYPUS. 研究期間：10108 ~ 10207
&lt;br&gt;</description>
      <pubDate>Fri, 08 Jun 2012 08:00:17 GMT</pubDate>
    </item>
    <item>
      <title>台灣中子散射實驗設施在澳洲實驗站三軸散射儀之運作與管理計畫;Operation and Management of Taiwan Neutron Beam Facility - Triple-Axis Spectrometer at Ansto, Australia</title>
      <link>https://ir.lib.ncu.edu.tw/handle/987654321/52684</link>
      <description>title: 台灣中子散射實驗設施在澳洲實驗站三軸散射儀之運作與管理計畫;Operation and Management of Taiwan Neutron Beam Facility - Triple-Axis Spectrometer at Ansto, Australia abstract: 2005 年6 月8 日國科會基於推動中子散射應用實驗，透過駐澳大利亞台北經濟文化代表處與澳大利亞商工辦事處，簽訂台澳「Agreement on Neutron Beam Applications Research」。依據該協議書，由國科會出資在位於澳洲雪梨附近的 Australian Nuclear Science and Technology Organisation (ANSTO)興建一部新一代冷中子三軸散射儀。透過「台灣中子束實驗設施應用站建置計畫」的冷中子三軸散射儀SIKA(依台灣特有梅花鹿學名Formosa sika deer 命名)，即將興建完成。完成後擬派1 位儀器科學家,1 位博士後研究,1 位博士生與ANSTO 聘任之資深三軸散射儀專家一同組成非彈性散射團隊負責運作與管理SIKA。 依規劃，澳洲OPAL 核反應爐每年運行340 天。SIKA 運作後，台灣即具有主控權使用ANSTO 所運作的中子散射儀中總共約240 天之實驗時間，提供國內各領域研究團隊管理使用。 SIKA 預計於2011 年7 月間即可完成組裝，再通過ANSTO 的安全審核通過後，進入準直測試階段，調置儀器各部間運作之相互準直，再通過ANSTO運作審核後，預計將於2012 年中加入ANSTO 的用戶安排開放用戶申請從事中子散射實驗。本計畫的任務在管理SIKA 的運作，實驗時確保SIKA 運作正常並符合安全規範，主軸項目包括建立SIKA 的儀器科學家團隊、安排審核通過的用戶實驗計畫、協助用戶設置SIKA 的儀器操作模式、協助用戶安全及有效率地運作SIKA、提供用戶所需的實驗環境、有限度的協助用戶從事非彈性中子散射實驗數據分析、建立台灣的研究團隊。According to the 「Memorandum of understanding between the Australian Commerce and Industry Office and the National Science Council of Taiwan for technical cooperation on neutron beam applications research」, signed on June 8, 2005, NSC is responsible to (i) provide funding and complete construction, within 4 years, of a cold neutron triple-axis spectrometer (CNTAS) at the OPAL reactor of ANSTO, and (ii) provide human resources at the level of 4 persons plus local administrative support for the operation of the CNTAS after hot commissioning and with the operational license issued. A 70% of one instrument time, which may be distributed over the full set of neutron beam instruments at the OPAL, will then be allocated for the NSC related scientists. In fulfilling and utilizing the Agreement, this proposal aim to build up a 「Taiwan neutron beam application station」 at OPAL for Taiwan community. We make plans to operate the following projects: (1) managing the operation of SIKA; (2) set up a topic for inelastic research group; (3) run users’ programs to support neutron scattering experiments to be conducted on SIKA. 研究期間：10108 ~ 10207
&lt;br&gt;</description>
      <pubDate>Fri, 08 Jun 2012 08:00:15 GMT</pubDate>
    </item>
  </channel>
</rss>

