    題名: Applying building information modeling to integrate schedule and cost for establishing construction progress curves
    作者: 王翰翔;Wang, Kun-Chi;Wang, Wei-Chih;Wang, Han-Hsiang;Hsu, Pei-Yuan;Wu, Wei-Hao;Kung, Cheng-Ju
    貢獻者: 工學院土木工程學系
    關鍵詞: Assembly;Building information modeling;Building management systems;Construction costs;Object recognition;Progress curves;Quantity takeoffs;Schedules;Scheduling;Scheduling, activity cost;Takeoff;Three dimensional models
    日期: 2016-12-01
    上傳時間: 2026-04-21 14:07:45 (UTC+8)
    出版者: Elsevier;Amsterdam: Elsevier B.V
    摘要: 摘要: A cost-based progress curve (called S-curve) is often used to control construction project schedules. To establish a progress curve, the costs that are associated with each scheduling activity must be determined. However, the distributions of the quantities (costs) of cost items among various activities are time-consuming to obtain and error-prone, yielding an unreliable S-curve. This work proposes the use of three-dimensional building information model (BIM) objects to integrate schedule and cost by using the powerful BIM for data acquisition and storage. BIM objects are incorporated into a proposed four-step model to establish construction progress curves. The proposed model defines search criteria (cost item, object, floor, and zone) that precisely identify takeoff objects for extracting the quantities of cost items associated with each activity. The BIM uses keynote, assembly code, and family type catalog functions to provide pop-up menus for the efficient identification of cost items that are associated with each object to preventing errors in the manual typing of cost-item names. Finally, this work demonstrates that uploading the cost items and unit prices into cost estimation software in advance is critical to automating cost estimations in BIM. •BIM objects are used to integrate schedule and cost for establishing an S-curve.•The model defines search criteria to identify objects for extracting quantities.•The model distributes the quantities associated with cost items among activities.•Using family type catalog functions support the inclusion of cost items in objects.•Uploading cost data to estimation software in advance is critical for automation.
    出版者: Amsterdam: Elsevier B.V
    出版日期: 2016-12
    出處: Automation in construction, 2016-12, Vol.72, p.397-410
    資源來源: Elsevier ScienceDirect Journals Complete
    版權: 2016 Elsevier B.V.
    版權: Copyright Elsevier BV Dec 2016
    識別號: ISSN: 0926-5805
    識別號: EISSN: 1872-7891
    識別號: DOI: 10.1016/j.autcon.2016.10.005
    顯示於類別:[土木工程學系 ] 期刊論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML25檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明