中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/1458
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 81570/81570 (100%)
Visitors : 47025762      Online Users : 108
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/1458


    Title: 營造工地管理人資量化與預測;Abstract of Quantifying Managerial Personnel Costs of Field Office Overhead in Taiwan Construction Projects
    Authors: 張志國;Chih-Kuo Chang
    Contributors: 土木工程學系碩士在職專班
    Keywords: 迴歸分析;人資成本;人資成本預測;營造工程;Human recourse allocation;Field office;Overhead;Managerial personnel cost
    Date: 2005-06-20
    Issue Date: 2009-09-21 09:29:36 (UTC+8)
    Publisher: 國立中央大學圖書館
    Abstract: 營建工程成本研究乃營建工程之重要課題,以往之研究,一般針對工程直接施工成本探討著墨較多,對工程管理人資成本常以一定比例方式計算,而比例之多寡又依各公司之經驗值概略判斷決定之,未有量化數據可供參考,而營造廠於投標階段如何準確估計管理人資成本,亦為決定標價與預估人力調度之重要參考。故本研究以『營造工地管理人資量化與預測』為主題,祈能將研究結果供業界參考。 本研究以蒐集業界實際案例,經分類整理、歸納分析,應用統計學迴歸分析技術,探討工地管理人資成本與產值,並建構預測模式,並以實例檢驗與驗證,確認預測模式之可行性。利用預測模式,可以快速準確預估工地管理人資成本,而成本之探討亦可作為工地績效考核與人力調度之參考。 Construction cost is one of most important issues discussed repeatedly in the construction industry. Many studies have pointed out methods utilized to reach optimal cost control for decades; however, quantifying the managerial personnel costs of the field office overhead to effectively manage budgets in Taiwan is usually based on experienced and educational guesstimates. An erroneous estimate of the cost offsets the profit gained from the project or damages management processes of the project. This research conducted a quantifying model founded on laborious processes of data collections and analyses, including 78 construction projects in recent 16 years classified into residential buildings, industrial office buildings, commercial buildings and industrial construction. The model provides a simple mathematical equation for contractors to easily quantify managerial personnel costs of field office overhead while undertaking estimates for construction projects before bidding the projects. The results concluded that it is predictable to perform human recourse allocation with reasonable costs of managerial manpower in a construction project.
    Appears in Collections:[Executive Master of Civil Engineering] Electronic Thesis & Dissertation

    Files in This Item:

    File SizeFormat


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明