English  |  正體中文  |  简体中文  |  Items with full text/Total items : 81570/81570 (100%)
Visitors : 47019777      Online Users : 119
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version

    Community Statistics


    Item counts issued in 3 years: 77(6.91%)
    Items With Fulltext: 1114(100.00%)

    Download counts of the item
    Download times greater than 0: 1114(100.00%)
    Download times greater than 100: 1046(93.90%)
    Total Bitstream Download Counts: 623437(1.45%)

    Last Update: 2025-04-28 10:19

    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 441-450 of 1114. (112 Page(s) Totally)
    << < 40 41 42 43 44 45 46 47 48 49 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2013-07-24 越庫作業區域之進貨與理貨作業的探討 楊宗翰; Yang,Tsung-Han
    2013-07-23 允許缺貨後補之產能擴張問題; Capacity expansion problems with backlogging 李承浩; Lee,Cheng-Hao
    2013-07-23 在考量服務水準之線性市場中兩家競爭零售商之最佳決策問題; Optimal Decision Problem between two Competition Retailers with Consideration of Service Level in a Linear Market 楊嵩灝; Yang,Sung-hao
    2013-07-23 在隨機的回收數量下逆物流中的最佳生產量; An Optimal Production in Reverse Logistics with Consideration of Stochastic Return Quantity 呂錏泓; Lu,Ya-hung
    2013-07-22 在數量彈性合約之下考慮逆向物流的通路協調; Channel coordination of reverse logistic under quantity flexibility contract 楊士驊; Yang,Shih-hua
    2013-07-19 考量機台彈性維護限制之平行機台求極小化總完工時間排程問題; Parallel machine scheduling with flexible maintenance activities for minimizing total completion time 許文志; Hsu,Wen-Chih
    2013-07-19 利用分支界限法求具有機台可用時間限制與工作可分割特性的平行機台排程問題之最佳解; A Branch and Bound Algorithm for Parallel Machine Scheduling with Availability and Job Preemption Constraints 鄭善尉; Cheng,Shan-wei
    2013-07-19 具多次彈性維護限制之單一機台求極小化總完工時間排程問題; Single Machine Scheduling with Flexible Maintenance Periods for Minimizing Total Completion Time 李明倫; Lee,Min-Lun
    2013-07-19 逆向物流系統中的最佳解於WEEE為例; Optimization of reverse logistics systems in WEEE 阮氏凊春;
    2013-07-15 LED磊晶片與晶粒製造之產能規劃; Capacity Planning for LED Epiwafer and Die Manufacturing 徐清鴻; Hsu,Ching-Hung

    Showing items 441-450 of 1114. (112 Page(s) Totally)
    << < 40 41 42 43 44 45 46 47 48 49 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明