中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/64715
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 81570/81570 (100%)
造访人次 : 47020058      在线人数 : 121
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/64715


    题名: 第二代臺灣地區橋梁管理資訊系統建置規劃(二);Planning and Implementation of the Second Generation of Taiwan Bridge Management Information System (II)
    作者: 姚乃嘉;黃榮堯;葉啟章;蔡閔光
    贡献者: 國立中央大學營建管理研究所
    关键词: 土木水利工程;公共行政;Bridge Management System;3D Bridge Model;Bridge Inspection;Mobile APP
    日期: 2014-09-10
    上传时间: 2014-09-10 15:25:35 (UTC+8)
    出版者: 交通部運輸研究所
    摘要: 研究期間:10305~10312;“Taiwan Bridge Management System (TBMS)” has been used for more than 13 years since its establishment in 2000. In order to reinforce the abilities of TBMS in assessing bridges’ capabilities of resistance to floods, earthquakes, and loading, and bridges’ deterioration conditions, Institute of Transportation (IOT) issued the project of “Planning and Establishment of the 2nd generation of Taiwan Bridge Management System (TBMS2)” in 2013. The TBMS2 project was conducted by National Central University (NCU) in which research efforts were focusing on the development of component-based, mobilization-based, and custom-based functions. NCU research team planned the system architecture and functions of TBMS2 based on literature reviews, expert interviews and seminars. There are two systems in TBMS2, a main system running on a network server and an application software (App) running on tablets for bridge inspection. The main system is able to generate three dimensional (3D) bridge models for common concrete bridges based on their basic data. In addition, six functional modules have been implemented in the main system: (1) Basic Data Module, (2) Inspection Data Module, (3) Maintenance Records Module, (4) Statistics Module, (5) Condition Analyzing Module, and (6) Management Functions Module. In the bridge inspection App (iOS version), there are four major functions: (1) automated generation of 3D bridge models for common concrete bridges, (2) component-based visual inspection of bridges, (3) auxiliary deterioration photos for deterioration assessment, and (4) automatic uploading of inspection results to the TBMS main system. The App is available for downloading for authorized users. Three sessions of TBMS2 training courses were conducted in Taipei, Taichung, and Kaohsiung last year. Research tasks of TBMS2 in 2014 will be focusing on improvements of the main system and the bridge inspection App. In the main system, the improvements include: (1) generation of 3D bridge models for special bridges, (2) modification of Basic Data Module for special bridges, (3) modification of Inspection Data Module for special bridges, (4) implementation of management functions after disasters, (5) implementation of Decision-support Module, (6) implementation of Data Exchange Module, (7) implementation of Disaster Prevention Information Module, and (8) implementation of Geographical Information Module. In the App, in addition to similar improvements for special bridges, two tasks are needed (1) maintenance of the existing App (for TBMS), and (2) implementation of new Apps in both iOS and Android versions for the main system of TBMS2. After TBMS2 are completed, three sessions of training courses will also be conducted in in Taipei, Taichung, and Kaohsiung. Finally, promotion strategies for use of TBMS2 will also be proposed in this project.
    關聯: 財團法人國家實驗研究院科技政策研究與資訊中心
    显示于类别:[營建管理研究所 ] 研究計畫

    文件中的档案:

    档案 描述 大小格式浏览次数
    index.html0KbHTML672检视/开启


    在NCUIR中所有的数据项都受到原著作权保护.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明