中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/72081
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 81570/81570 (100%)
Visitors : 47029133      Online Users : 81
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/72081


    Title: 以屬性為導向的變更影響分析方法應用於計劃管理;Attribute - Oriented Change Impact Analysis Method Applied to Program Management
    Authors: 張祥庭;Zhung,Siang-Ting
    Contributors: 資訊管理學系
    Keywords: 計劃管理;變更影響分析;組態管理;屬性導向;組態項目;Program Management;Change Impact Analysis;Configuration management;Attribute Oriented;Configuration Items
    Date: 2016-07-11
    Issue Date: 2016-10-13 14:25:24 (UTC+8)
    Publisher: 國立中央大學
    Abstract: 計劃管理(Program Management)為同時管理多個項目的一套方式,對於須管理軟體元件、服務、產品等多個項目的軟體服務業非常重要。然而計劃由多個專案、服務、人員、產品等組成,造成計劃部份項目進行變更時,可能會影響到多個項目。所以在計劃管理中,必須透過組態關聯進行變更影響分析以及計劃項目變更,以達成計劃項目的一致性。因此本研究提出以屬性為基底之變更影響分析方法以及組態關聯來輔助計劃管理,具體而言,此方法是透過組態關聯連結有關聯之組態項目的屬性,並依據屬性組態關聯之屬性連結進行變更影響分析,來釐清計劃項目變更時影響的範圍。最後,本研究將再進一步透過上述所敘之規則建立出一套PCIA(Program Change Impact Analysis)系統來輔助計畫管理人員達到計劃管理。;Program management is a method to manage multiple items, and is important to software services including software component, service, and product management. However a program is combined with multiple projects, services, staffs, and products. When items within a program are changes, many projects may be affected. Therefore in Program Management, we must process Change Impact Analysis and Project Item Change through Configuration Association, to maintain the consistency of project items. Therefore this study proposed an attribute based Change Impact Analysis method and Configuration Association to assist program management. In particular, this method clarify the affected scope of project item changes made by linking related attributes within association items through Configuration Association, and analysis Change Impact according to attributes connection within Configuration Association. Finally, this study established a PCIA(Program Change Impact Analysis) system according to rules described above to assist program managers carry out program managing.
    Appears in Collections:[Graduate Institute of Information Management] Electronic Thesis & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML279View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明