參考文獻 |
【英文文獻】
1.Chopra, S., and Meindl, P. (2001), Supply Chain Management: Strategy, Planning, and Operation, Prentice Hall: Upper Saddle River, NJ.
2.Dornier, P., and Ernst,R.(1998). GlobalOperations and Logistics: Text and Cases, John Wiley and Sons.
3.Dalton, G. (1999).“Globalization - Global Gravity,”InformationWeek.
4.Ellram, L. M. (1991).“Supply Chain Management:The Industrial Organization Perspective,”International Journal of Physical Distribution and Logistics Management, Vol.21, Iss. 1,13-22.
5.Ellram, L. M., Londe, B. J., and Weber, M. M. (1989).“Retail Logistics,” InternationalJournal of Physical Distribution and Materials Management, Vol. 19, Iss. 12,29-39.
6.Handfield, R., and Nichols, E. (1999).“Introduction to Supply Chain Management”, Prentice-Hall, Inc.
7.Houlihan, J. (1984). Supply Chain Management,Proceeding of the 19th International Technical Conference of the British Production and Inventory Control Society.
8.Johnson, J. C., and Wood, D. F. (1996).Contemporary Logistics, Prentice-Hall InternationalEditions, 6th Ed.
9.Kalakota, R., and Whinston, A. B. (1996).Frontiers of Electronic Commerce, Addison-Wesley Publishing.
10.Simchi-Levi, D., Kaminsky, P., and Simchi-Levi, D. (2001). Designing and Managing the Supply Chain: Concepts, Strategies and Case study, The McGraw-Hill Companies, Inc.
11.Seidmann, A. and Sundararajan, A. (1998). “Sharing Logistics Information Across Organziations:Technology, Competition and Contracting,” Chris F. Kemerer (Ed.), Information Technology and Industrial Competitiveness:How IT Shapes Competition, 107-136.
12.Marilyn, M. H., Lawrence P. E., and Sharon C. (2000), “Supply Chain Forecasting – Collaborative Forecasting Supports Supply Chain Management,” Business Process Management Journal, 6(5), pp. 392-407.
13.META Group (2001).the Four Horsemen of Collaboration.
14.Miltenburg, J. and Sparling, D. (1996). “Managing and reducing total cycle time: Models and analysis,” International Journal of Production Economics, 89-108.
15.Nordhaus, W.D. (1987). “Forecasting Efficiency: Concepts and Applications,” The Review of Economics and Statistics, 69(4), pp. 667-674.
16.Yin, R. K. (1994). “Case Study Research: Design and Methods,”SagePublications Thousand Oaks.
【中文文獻】
1.王立志(1999),系統化運籌與供應鏈管理,滄海書局。
2.邱五岳(2006),「供應鏈協同價值創新合作程度與績效的關係研究-指標與衡量」
,國立成功大學企業管理研究所。
3.邱憶惠(1999),「個案研究:質化取向」,國立高雄師範大學教育系教育研究,七期,頁113-127。
4.黃貝玲(2001),「協同商務價值鏈管理」,電子化企業經理人報告,20期,頁12-23。
5.黃貝玲(2002),「協同商務-勾勒第二波電腦網路革命的商業模式」,電子化企業經理人報告,34期,頁12-21。
6.張怡筠(2006),「CPFR中滾動式預測的關鍵因子探討」,國立清華大學資訊系統與應用研究所碩士論文。
7.張榮圳(2000),「供應鏈管理資訊分享模式之研究」,國立中山大學資訊管理研究所。
8.梁文耀與周育賢(2003),「資訊價值對於供應鏈中零售商存貨/缺貨成本之研究」,擷取自http://www.if.itri.org.tw/content05/03if44.htm,(存取時間:2011年4月11日。)
9.許享承(2006),「綠色供應鏈管理機制建構之研究 - 以A 公司為例」,國立中央大學資訊管理研究所。
10.陳正芳(2004),「供應鏈中資訊分享的價值」,逢甲大學工業工程所。
11.陳曉屏(2002),「企業電子化下協同作業發展之研究」,國立政治大學商學院經營管理碩士學程全球經營與貿易組。
12.傅建銘(2002),「探討供應鏈管理在空調產業之應用」,中原大學工業工程學系。
13.黃庭鍾(2003),「企業因應長鞭效應之存貨政策研究-以我國主機板製造業廠商為例」,國立東華大學企業管理研究所。
14.楊昭峯(2002),「製造策略對逆向供應鏈績效之影響」,國立成功大學工業管理研究所。
15.蔡志宏(2004),「台灣汽車產業之供應鏈整合探討-以中華汽車為例」元智大學工業工程與管理研究所。
16.鄭穎聰(1999),「供應鏈長鞭效應因應政策之研究」國立台北科技大學生產系統工程與管理研究所。
17.薛文瑞與徐世昌(2009),贏在競合,商周出版。
18.賴誼靜(2007),「供應商管理存貨(VMI)機制下產銷協同關係之研究—以個人電腦產業為例」,國立中央大學工業管理研究所。
19.謝依潔(2007),「供供應鏈滾動預測與訂單策略之模擬研究」,國立中央大學資訊管理研究所。
20.蘇雄義(2008),供應鏈管理:原理、程序、實務,智勝文化。
21.盧舜年與鄒坤霖(2002),供應鏈管理的第一本書,商周出版。
|