參考文獻 |
Ahmed, S., ( 2002). Semiconductor tool planning via multi-stage stochastic programming. Proceeding of the 2002 International Conference on Modeling and Analysis of Semiconductor Manufacturing: 153–157.
Bahinipati, B. K., Deshmukh, S. G., ( 2012).Vertical collaboration in the semiconductor industry: A decision framework for supply chain relationships. Computers & Industrial Engineering 62:504-526.
Barneet, W. S., ( 1992). Benefits of compensatory preschool education. The Journal of Human Resources 27( 2):279-312.
Barahona, F., Bermon, S., Gunluk, O., Hood, S., ( 2005). Robust capacity planning in semiconductor manufacturing. Naval Research Logistics 52: 459-468.
Beamon, B. M., ( 1998). Supply Chain Design and Analysis: Models and Methods. International Journal of Production Economics 55( 3): 281-294.
Bermon, S., Hood, S., ( 1999). Capacity optimization planning system ( CAPS).
Interfaces 29( 5): 31-50.
Croom, S., Romano, P., Giannakis, M., ( 2000). Supply Chain Management: an Analytical Framework for Critical Literature Review. European Journal of Purchasing and Supply Management 6: 67-83.
Denton, B. T., Forrest, J., Milne, R. J., ( 2006). IBM solves a mixed-integer
program to optimize its semiconductor supply chain. Interface 36( 5): 386-399.
Frederix, F., ( 1992). Planning and scheduling multi-site semiconductor production chains: survey of needs, current practices and integration issues. Proceedings of the Conference on Integration in Manufacturing: 107-116.
Geary, S.,(1999). Top Performers Cut Total Supply-Chain Costs to 4% - 5% of Sales. Business Wire 1999-08-11.
Harland, C. M., ( 1996). Supply Chain Management: Relationships, Chains and Networks. British Journal of Management 7( 1): 63-80 .
Hood, S. J., Bermon, S., Barahona, F., ( 2003). IEEE Transactions on Semiconductor Manufacturing 16( 2): 273-280 .
LaForge, P., ( 1995). Telecommunications industry improves delivery performance study rates High-Tech Supply Chain. Business Wire.
LEDinside網站, ( 2007). 淺談LED晶粒/晶片製造流程.
http://www.ledinside.com.tw/knowledge/20071120-1219.html.
McCarthy, E. P., Burns, R. B., Freund, K. M., Ash, A. S., Shwartz M., Marwill, S. L., Moskowitz, M. A., ( 1997). Mammography use, breast cancer stage at diagnosis, and survival among older women. Journal of the American Geriatrics Society 48( 10).
Rastogi, A. P., Fowler, J. W., Carlyle, W. M., Araz, O. M., Maltz, A., Buke, B., ( 2011). Supply network capacity planning for semiconductor manufacturing with uncertain demand and correlation in demand considerations. International Journal Production Economics 134: 322-332
Rupp, T.M., Ristic, M., ( 2000). Fine planning for supply chains in semiconductor manufacture. Journal of Materials Processing Technology 107:390-397
Semiconductor Industry Association,(2009). Global Semiconductor Sales Fell by 2.8 Percent in 2008. http://www.semiconductors.org/news/2009/02/02/global_sales_reports_2008/global_semiconductor_sales_fell_by_2.8_percent_in_2008/.
Semiconductor International Capacity Statitstics,(2011). Statics Report. http://www.semiconductors.org/industry_statistics/semiconductor_capacity_utilization_sicas_reports/.
Stray, J., Fowler, J.W., Caryle, W.M., Rastogi, A.P., ( 2006). Enterprise-wide semiconductor manufacturing resource planning. IEEE Transactions on Semiconductor Manufacturing 19 ( 2):259–268.
Tabar, L., Gad, A., Holmberg, L. H., Ljungquist, U., Kopparberg County Project Group, Fagerberg, C.J.G., Baldetorp, L., Grontoft, O., Lundstrom, B., Manson, J. C., Ostergotland County Project Croup, Eklund, G., Day, N. E., Pettersson F., ( 1985). Reduction in mortality from breast cancer after mass screening with mammography: Randomised trial from the breast cancer screening working group of the Swedish national board of health and welfare. The Lancet 325( 8433):829-832.
Uzsoy, R., Lee, C.-Y., Martin-Vega, L.A., ( 1992). A review of production planning and scheduling models in the semiconductor industry, Part I: system characteristics, performance evaluation and production planning. IIE Transactions Scheduling Logistics 24 ( 4): 47-61.
Wang, W., Rivera, D. E., Kempf K. G., ( 2007). Model predictive control strategies for supply chain management in semiconductor manufacturing. International Journal of Production Economics 107:56-77.
Yang, J. L., ( 2000). An approach to determine appropriate fab development plans by taking space constraints and cost-effectiveness into consideration. The Ninth International Symposium on Semiconductor Manufacturing: 217–220.
Yoshikawa, H., ( 1995). Long-term effects of early childhood programs on social outcomes and delinquency. The Future of Children 5 ( 3):51-75.
俞明德, 徐之強, 陳厚銘, 陳建良, 管中閔, 蔡穎義, 謝明慧 ( 2011). 台灣產業
發展的規劃藍圖.中華民國總統府, http://www.president.gov.tw/.
工業技術研究院,( 2007). LED 照明產業應用趨勢分析.
http://www.taiwangreenenergy.org.tw .
蘇思潔 ( 2012). LED產業供應鏈之策略性規劃. 國立中央大學,碩士論文.
詹惠珠 ( 2013). 晶電 5月營運打強光. 經濟日報 2013-05-09. http://udn.com/NEWS/STOCK/STO3/7884538.shtml. |