dc.description.abstract | In 21st century, IT electronic consumer products iswide and variety, and thelife cycle is shortened. It most components of the product supply from the mainland China or Taiwan, but some of the main components from the European and American countries, such as CPU, NetCom products IC also comes from the United States, the delivery date at least 4 weeks to 12 weeks. The long lead timesupply, Can meet customer? In addition to the many different kinds of parts, relatively whether instant on imported material supply. It will affect the customer′s sales, customer the most care about is not out of stock and no inventory pressure, at the same time, the factory also need to control inventory turnover. How to control the long period of material?How to improvement long lead time materials supply?It is helpful for the sustainable development of the enterprise in competition marking.
With the development of computer information technology and the application of lean manufacturing continuous improvement, also developed to improve the supply of materials management, from the early large amounts of material management requirements, need computer fast arithmetic of MRP and MRP Ⅱ, and type of demand pull manufacturing (Just In Time, JIT), and the (Theory of Constrains, TOC)thatthe bottleneck limit system.
This research is by the case company for many years in the long period of replenishment order to improve the research, to discuss the material supply can satisfy supply is out of stock, and can meet the factory inventory, in order to apply the results promote in similar industry material supply, the conclusions are as follows:
(1) Improvement pull in supply by red, green and yellow stock control system.
(2) Strengthening continuous education training implementation. | en_US |