dc.description.abstract | The world has changed due to the progress of the vehicle, the aircraft flying from the Eastern Hemisphere to the Western Hemisphere only for more ten hours; the world′s major airports is also due to the increase in the number of passengers constantly expanding, to provide passenger transportation convenience, have built The MRT between the metropolitan area and the airport to facilitate the transport of passengers. However, if an MRT only serves passengers who entering and leaving the airport, it is bound to miss the cost of construction and operation. Therefore, the Taoyuan International Airport MRT will have an express and commuter respectively. The express that is to serve passengers out of the airport-based, the commuter will be served along the residents as a priority. In order to successfully serve more residents to get off work or take other modes of transport (such as high-speed rail, railway, all kinds of passenger vehicles, etc.).
In order to verify the rationality and practicability of this research model, this research takes a company with its own and the rental of drill jumbo equipment in the gravel formation drilled for the deployment of drilling as an example, for simulation testing. A set of mathematical optimization model is constructed by using the integer programming method. With the LINGO 12.0 software package, the model is transformed into a software acceptable program, and the required data is imported or output from Excel 2010 by using interface function. Used in conjunction with simulation testing in an effort to achieve optimization and minimize costs, comparing this to the cost of real world labor allocations to confirm lower costs and greater efficiency. This can also be used as a timely reference to enable those in charge to make more accurate decisions. This research can also be applied to the assignment of machines and tools on construction projects. | en_US |