博碩士論文 106322068 完整後設資料紀錄

DC 欄位 語言
DC.contributor土木工程學系zh_TW
DC.creator鄭翔易zh_TW
DC.creatorXiang-Yi Zhengen_US
dc.date.accessioned2019-8-21T07:39:07Z
dc.date.available2019-8-21T07:39:07Z
dc.date.issued2019
dc.identifier.urihttp://ir.lib.ncu.edu.tw:444/thesis/view_etd.asp?URN=106322068
dc.contributor.department土木工程學系zh_TW
DC.description國立中央大學zh_TW
DC.descriptionNational Central Universityen_US
dc.description.abstract因應近幾年氣候變遷大,容易發生各種災害,其中堰塞壩潰決造成下游嚴重的災害,如能了解其發生機制,有助於防災及疏散預警以降低災情。本研究以實驗探討非黏性之石英砂堆積之堰塞壩,實驗以影像分析及超聲波探測器觀察上游及壩頂之歷程變化。依供水及土壤特性可分為漸進式破壞及溢流破壞兩種,並改變堰塞壩幾何關係,以探討其破壞歷程之差異性,並分析未破壞時滲流線的變化,及潰壩過程的土體及出流量變化。zh_TW
dc.description.abstractThe failure process of the landslide dam due to seepage and overtopping is experimentally explored in this study. Both triangle and trapezoidal dams of coarse quartz sand are built in the flume, and the failure modes due to progressive seepage damage or abrupt overflow are observed. The transient phreatic line prior to the seepage failure develops in a self-similar shape form in terms of the advancing front height and distance. The discharge at the dam can be estimated according to the flow characteristics over half-circular weir. The histogram of dam-breaking flood and the sediment transport of the dam are analyzed.en_US
DC.subject堰塞壩zh_TW
DC.subject滲流線zh_TW
DC.subject出流量zh_TW
DC.subject滲流破壞zh_TW
DC.subject溢流破壞zh_TW
DC.subjectLandslide damen_US
DC.subjectseepage lineen_US
DC.subjectoutflowen_US
DC.subjectseepage failureen_US
DC.subjectovertoppingen_US
DC.title堰塞壩之滲流及溢流破壞歷程分析zh_TW
dc.language.isozh-TWzh-TW
DC.type博碩士論文zh_TW
DC.typethesisen_US
DC.publisherNational Central Universityen_US

若有論文相關問題,請聯絡國立中央大學圖書館推廣服務組 TEL:(03)422-7151轉57407,或E-mail聯絡  - 隱私權政策聲明