dc.description.abstract | Since 2016, the government′s vigorous promotion of renewable energy has achieved initial outcomes. In March 2022, the solar photovoltaic installation capacity has reached 8.045GW, an increase of 5.46 times. Due to carbon reduction requirements for international supply chain and power users with a contracted capacity (more than 5,000 kW must set up renewable energy sources with 10% of the contracted capacity within 5 years) as well as the future carbon fee collection and other factors, all promote the increase in demand for green electricity. On the World Earth Day in 2021, President Tsai also declared that the 2050 net-zero transition is the goal of the world and also the goal of Taiwan. At the same time, it can reverse the high risk of Taiwan′s dependence on international imports, and reduce the dependence on imported energy from 97.4% in 2021, down to less than 50% in 2050, reducing the impact of international energy market shocks and price fluctuations on China′s energy security. Solar energy has attracted much attention because of its high stability and low risk, and has considerable room for development in Taiwan. With the rapid increase in the demand for domestic power plants, the talents required by the photovoltaic industry are becoming more and more important. Every solar power plant construction hopes that the project can be successfully completed through the implementation of project management. The procurement and contracting personnels are important member of the solar power plant project, and the training and education of the personnels relies on the accumulation of experience. However, the end of the project is commonly the same as the experience. Knowledge then leaves, and tacit knowledge is not easy to save, spread and share. Therefore, this research uses the PMBOK® as the backbone, and refer to the practical case data of two EPC companies to construct the knowledge map of solar power plant project procurement, which includes the solar power plant EPC project procurement flow chart, the solar power plant EPC project procurement essential worksheet, and the procurement list for solar power plant EPC project and related key elements. This research verifies the feasibility of the research outcomes by means of expert interviews. Therefore, the knowledge map completed in this research can be used as a work manual for procurement personnels to refer to when performing different tasks at various stages. | en_US |