dc.description.abstract | 2nd level maintenance workshop at all levels is the basis within the Army maintenance service, that is, a pivot section in the grassroots equipment maintenance, which do not being subjected to mission, support, service, day off and so on. Human resource dispatching in Army 2nd level maintenance depends on the pre-arranged schedule, which scheduled by the master sergeant of supervision based on the personnel assignment, mission requirement and the empirical constant. Although the maintenance of equipment can be done punctually in every quarter, but still, there are some flaws that can be improved within the system, If we use a mathematical model for limiting personnel to optimize for a better result, the model can allow missions to be done in a fairer and high standard condition.
This research took the 2nd engineer battalion of the Army for example, the purpose is to find the best personnel assignment by using optimization. With the mathematical model and LINGO 18.0 software, it’ll be easier and more efficient to send out Excel data and to construct a better assignment schedule, after the whole process, we can use Sensitivity analysis to examine the change in personnel, equipment and the optimized result from capacity assignment in workshops. These data can provide commanders or leaders at all levels as a reference for assigning jobs. Quantification benefits the system from saving more time, reducing cost and improving efficiency, also makes the assignments on personnel more reasonable which avoid misusing the personnel. | en_US |