博碩士論文 963302004 完整後設資料紀錄

DC 欄位 語言
DC.contributor土木工程學系在職專班zh_TW
DC.creator黃文隆zh_TW
DC.creatorwen-lung Huangen_US
dc.date.accessioned2008-11-22T07:39:07Z
dc.date.available2008-11-22T07:39:07Z
dc.date.issued2008
dc.identifier.urihttp://ir.lib.ncu.edu.tw:444/thesis/view_etd.asp?URN=963302004
dc.contributor.department土木工程學系在職專班zh_TW
DC.description國立中央大學zh_TW
DC.descriptionNational Central Universityen_US
dc.description.abstract本研究是針對規劃設計階段基礎工法之選擇和基樁現地載重試驗後效益分析為研究對向,並以新板特區橋峰大樓基礎工程為研究範圍。 在規劃設計階段,工法的選擇直接與工程成本具有密切關係,除了材料本身具有市場價格外,技術、機具、人員、時程等變動形成直接或間接的影響,對於各式基樁工程所使用之機器設備在市場佔有率、施工可行性、技術人員、工期及工法考量等運用於壁樁、反循環樁、全套管基樁工法並做比較及各式基樁運用於深開挖工法之聯合使用上做比較,而選擇較經濟性和方便性之工法。 在載重試驗上針對新板特區橋峰大樓之壁樁工程運用於超高層建築之載重前、後效益分析,透過本研究,對壁樁之施工及載重有更深層的認識,在不必要成本支出的管理技術上和品質及安全確保下讓成本、技術、工期達到最高效益為本研究之目的。zh_TW
dc.description.abstractonsideration and so on utilizes in the wall pile, the counter-circulation pile, the entire drive pipe machine pile labor law and makes the comparison and various types foundation pile utilizes in excavates union of use in the labor law to do deeply compares, but chooses compares efficient and the conveniences labor of law. Utilizes in the loading test wall of pile project in view of the new board special zone bridge peak building in the extra-high building in the heavy before and after benefit analysis, by this research, has in-depth understanding to construction and the carrying capacity the wall pile, in the nonessential cost disbursement’’s managerial technique and the quality and guaranteed safely under lets the cost, the technology, the time achieve the highest benefit goal of for this research. This research is aims at choice and the foundation pile location the plan design stage grounding law after the heavy experiment the benefit analysis to approaches for the research, and take new board special zone bridge peak building foundation engineering as range of study. In the plan design stage, the labor method choice has the close relation directly with the project cost, has the current price on market except the material itself especially, changes and so on technology, machines and tools, personnel, time interval form direct or street’’s influence, of machinery equipment regarding various types foundation pile project use in the market share, the construction feasibility, the technical personnel, the time and the method cen_US
DC.subject深基礎開挖zh_TW
DC.subject連續壁zh_TW
DC.subject壁樁zh_TW
DC.subject載重試驗zh_TW
DC.subject高層建築zh_TW
DC.subject逆打工法zh_TW
DC.subjectthe continual wallen_US
DC.subjectthe wall pileen_US
DC.subjectthe carrying capacity experimenten_US
DC.subjectthe high-rise constructionen_US
DC.subjectcounter work the lawen_US
DC.subjectand the deep foundation to excavateen_US
DC.title建築基礎工程採用壁樁及其他工法成效之分析研究zh_TW
dc.language.isozh-TWzh-TW
DC.titleConstruction build to use wall-ytpe foundation and other manner results to analyze researchen_US
DC.type博碩士論文zh_TW
DC.typethesisen_US
DC.publisherNational Central Universityen_US

若有論文相關問題,請聯絡國立中央大學圖書館推廣服務組 TEL:(03)422-7151轉57407,或E-mail聯絡  - 隱私權政策聲明