dc.description.abstract公共工程全生命週期包括可行性評估、規劃、設計、施工、營運維護、拆除重建等階段,本研究係針對現行施工階段作探討。 本研究首先整理以往施工品質管理文獻及現行施工查核現況,導入全生命週期施工階段影響因素,製成施工階段問卷調查,應用SPSS軟體進行統計分析,得到全生命週期施工階段五個影響因素分別為營運維護管理品質查核、營造廠商及人員實施證照機制、規劃設計品質查核、品管證照機制、營造業品質管理系統導入ISO 9001品管機制。 配合現行施工查核案例作分析,得知施工查核有關規劃設計缺失統計,依設計缺失類別以設計不完整(70.7%)及設計遺漏(19.0%)佔最大比例,依工程類別作統計則以道路工程(37%)及建築工程(17%)佔最大比例。 最後再以SWOT分析法對現行之施工階段品質管理機制加以分析,以現行施工階段品質管理機制之既有作法稱為內部優勢(S)及劣勢(W),執行時可能發生之影響因素歸為外部機會(O)及威脅(T),接著以矩陣配對的四項原則(SO 原則、ST 原則、WO 原則、WT原則),擬訂施工階段品質管理提昇策略,並針對施工階段品質管理有關規劃設計提出改善策略: 1.建立規劃設計品管人員證照機制。 2.建立公共工程規劃設計階段品質查核機制。 zh_TW
dc.description.abstractA full life cycle of public construction consists of several phases, including feasibility assessment, planning, design, construction, operation and maintenance, demolition and reconstruction. This study focuses on the present construction phases. This study first conducted a literature on the construction quality management and the current situation of construction inspection, and then introduced the factors that affected the phases of full life-cycle public construction to construct a Construction Phase Questionnaire. Data analyses were performed by using SPSS and the five factors that affected the phases of full life-cycle public construction were obtained: the inspection of quality management in operation and maintenance, applying the certification systems to construction companies and personnel, the inspection of planning and design quality, the quality control certification systems, and implementing the ISO 9001 quality control systems in the quality management systems in the construction industry. By analyzing the present cases of construction inspection regard the failures in planning and design, the results showed that incomplete designs (70.7%) and defective designs (19.0%) accounted for the largest proportions in the category of design failures; roadway construction (37%) and building construction (17%) accounted for the largest proportions in the category of construction types. Lastly, with the SWOT analysis of the present quality management system during the construction phases, this study referred to the existing practices of quality management systems during the construction phases to the internal strengths (S) and weaknesses (W) and attributed the potential factors that might occur during construction to the external opportunities (O) and threats (T). Following the four principles of matrix pairing (SO principle, ST principle, WO principle, and WT principle), the strategies for enhancing quality management during the construction phases were developed and the planning and design strategies for improving quality management during the construction phases were proposed: 1. Establishing the certification systems for the personnel specialized in quality management for planning and design. 2. Establishing the quality inspection systems for the planning and design phases in public construction. en_US
DC.subjectSWOT分析zh_TW
DC.subject公共工程zh_TW
DC.subject全生命週期zh_TW
DC.subject施工查核zh_TW
DC.subjectublic constructionen_US
DC.subjectconstruction inspectionen_US
DC.subjectfull life cycleen_US
DC.subjectSWOT analysisen_US
DC.title公共工程全生命週期施工階段品質管理提昇策略zh_TW
dc.language.isozh-TWzh-TW
DC.titleStrategies for Enhancing Quality Management during the Construction Phases in Full Life-Cycle Public Constructionen_US