According to their visions and goals, enterprises set up their strategy and action plans in which projects or tasks are formed. During the project implementation, problems may occur to create the gaps between the planned and actual activities. Whether the project manager can analyze the problem systematically, identify the core issues and solve them is critical to the success of the project. Applying the theory of constraints (TOC) methodology, the author conducts a case study on a large information service project for a public enterprise. This study utilizes the thinking process of TOC of which the usage of three questions and five tree diagrams are described in details. The first step is to indicate “what to change,” and identify the core issues. Next determine what to change to and use the “Evaporating Cloud” to propose the “Injection.” Finally, to formulate how to cause the change we develop the strategies to remove the obstacles with appropriate actions.
The author used interviews, participatory observation, and document files to collect data. After unitizing the data, we followed the thinking process of TOC for analysis. We found that the organization structure affects the availability of internal resources and required outsourcing. Therefore we suggest that strong matrix organization or project management office approach is more appropriate for large information service projects so that the project manager could obtain and control the resources effectively. Meanwhile a win-win long-term partnership is the best IT outsourcing strategy. |
參考文獻 |
【英文文獻】
[1] Bogdan, R. C., & Biklen. S. K. (1992). Qualitative research for education: An introduction to theory and methods, (2nd ed.). Boston: Allyn and Bason.
[2] Eisenhardt, K. M. (1989). Building theories from case study research. Academy of management review, Vol. 14(No. 4), pp. 532-550.
[3] Khalfan, A. M. (2004). Information security considerations in IS/IT outsourcing projects: a descriptive case study of two sectors. International Journal of Information Management, Vol. 24(No. 1), pp. 29-42.
[4] Lacity, M. C. & Hirschheim, R. (1993). The information systems outsourcing bandwagon. Sloan management review, fall, pp. 73-86.
[5] Lee, J.- N. & Kim, Y.- G. (1999). Effect of partnership quality on IS outsourcing success: conceptual framework and empirical validation。Journal of Management information systems, Vol. 15(No. 4), pp. 29-61.
[6] Lincoln, Y. S. & Guba, E. G. (1985). Naturalist inquiry. Beverly Hills, CA: Sage.
[7] Lowell, M. (1992). Managing your outsourcing vendor in the financial services industry. Journal of Systems Management, Vol. 33 (No. 4), pp 23-36.
[8] Noreen, E., Smith, D. & Mackey, J. T. (1995). Theory of Constraints and Its Implications for Management Accounting: A Report on the Actual Implementation of The Theory of Constraints, North River Press, Incorporated.
[9] Schwalbe, K. (2010). Information Technology Project Management, Revised.,Cengage Learning.
[10] Yin, R. K. (1989). Case Study Research: Design And Methods (Applied Social Research Methods), Sage Publication.
【中文文獻】
[1] Huang, D.(2014),Project Plus: 專案管理。
[2] 王晃三 & 顏貽楨(2002),限制理論的問題管理模式,中華民國品質學會第 38 屆年會暨第 8 屆全國品質管理研討會發表之論文,中華民國品質學會。
[3] 田秀蘭(2006),質性研究的基本概念-研究方法概論,國立臺灣師範大學。
[4] 吳琮璠(1997),訊管理個案研究方法,資訊管理學報,第四卷(第一期),頁 7-15。
[5] 李榮貴 & 張盛鴻(2005),TOC 限制理論,中國生產力中心出版。
[6] 谷政昭(2004),顧客資訊服務供應商核心能力與再委外經營之探討-以台灣某國際資訊外商為例,銘傳大學管理科學研究所之論文。
[7] 岸良裕司(2009),問題不能拆開來看(張凌虛、鄭曉蘭譯),時報文化。
[8] 林升傑(2006),資訊系統委外管理與使用者滿意度之探討-以台灣中小企業為例,立德管理學院科技管理研究所碩士之論文。
[9] 林坤榮(2003),營造業外包商管理策略之探討,國立臺北大學企業管理研究所碩士班之論文。
[10] 林蒼裕(2006),實獲值管理在工程專案管理之應用-以A 機電工程公司工程專案為例,國立中央大學高階主管企管碩士班之論文。
[11] 邱俊仁(2005),專案管理應用於新產品開發之研究,國立清華大學管理學院管理科學學程碩士班之論文。
[12] 柯嵐祥(2006),結合策略地圖、平衡計分卡與限制理論進行流程改善-以某政府機關為例,國立清華大學工業工程與工程管理研究所碩士之論文。
[13] 美國專案管理學會(Project Management Institute)(2008),PMBOK-第三版。
[14] 高義展(2010a),應用限制理論建構適性化高雄都會區的成人數位學習系統,城市學學刊,第一卷(第一期),頁 85-113。
[15] 高義展(2010b),專案管理指標建構之研究,專案管理電子期刊,第三十八期,台灣專案管理學會。
[16] 張瑋(2013),限制理論應用於跨國大型系統工程專案,逢甲大學工業工程與系統管理學系碩士在職專班之論文。
[17] 曾玟誠(2011),套裝專案管理導入之關鍵成功因素-以 U 公司為例,中央大學資訊管理學系碩士在職專班之論文。
[18] 鈕文英(1999),自然探究法之理論與方法分析,高雄師大學報,第10期,頁 61-83,國立高雄師範大學。
[19] 黃水木(2006),整合衡量概念之 TOC 問題解決模式研究,中原大學工業工程研究所碩士之論文。
[20] 黃耀寬(2009),運用限制理論之思考流程探討數位學習資源整合-以公部門數位學習網站為例,國立中央大學資訊管理學系碩士班之論文。
[21] 楊豐松(2003),資訊系統發展團隊合作之突現與疊代囚犯兩難賽局共演化策略,國立政治大學資訊管理研究所博士班之論文。
[22] 劉昌晟(2002),全球資訊網大型多重專案管理資訊系統之研究-以營建業為例,國立政治大學資訊管理研究所碩士之論文。
[23] 蔡坤佑(2000),限制理論下建置企業資源規劃系統 (ERP) 之關鍵成功因素與導入架構,台灣大學資訊管理研究所碩士之論文。
[24] 蘇義雄(2013),由瀑布式開發轉變至敏捷式開發對專案管理的影響-以TDC個案研究為例,國立臺灣科技大學管理研究所碩士之論文。
【網站資料】
[1] 經理人雜誌(access:2014/4/10),面對大師/艾文.托佛勒,取自 http://www.managertoday.com.tw/?p=117。
[2] 管孟忠(access:2014/5/18),建構策略專案管理金字塔模型(2009),開南大學專案管理研究所,取自http://gipm.knu.edu.tw/。
[3] 管孟忠 (access:2014/3/10),專案管理組織的設計與選擇,開南大學專案管理研究所,取自http://gipm.knu.edu.tw/。
[4] 魏聖忠(access:2014/3/10),專案管理的手法只能管理專案嗎,專案經理雜誌,取自 http://pmsuccess.dyndns.org/joomla/index.php/2013-03-12-16-08-43/96-l/534-2013
[5] MBA智庫百科(access:2014/5/11),外包(Outsourcing),取自 http://wiki.mbalib.com/zh-tw/%E5%A4%96%E5%8C%85。
[6] MIC(access:2014/5/1),資策會資訊市場情報中心,取自http://mic.iii.org.tw/ 。
[7] 中華專案管理學會(access:2014/5/1),取自http://www.npma.org.tw。
[8] 美國專案管理協會(access:2014/4/23),取自 http://www.pmi.org。
|