摘要(英) |
Various sludge treatment processes including thickening, digestion, and dewatering have been implemented to reduce the amount of sludge to be disposed of. However, due to the lack of landfill capacity and high water content of the dewatered sludge, landfilling is not a good way and better sludge reduction approach should be applied. Sewage sludge, a product of the domestic wastewater treatment process, is the main source of organic sludge. The water content of sludge without treatment is about 98%, and with dewatering process the water content could be reduced to 80-90%. To further reduce the amount of sludge, methods such as sun-drying or heat exchanging could be implemented. This research examines the benefit of sludge drying process for a wastewater treatment plant in Northern Taiwan. The results showed that sludge drying method could reduce water content from 85.4% to 5.9%, thus reduced sludge from 140 tons/day to 22 tons/day. This indicates a significant reduction in sludge transportation from 8 loads to 2 loads daily, meanwhile the odor from the sludge can be eliminated by reducing the water content to below 30%. On the other hand, sludge drying enables recycle for various purposes depending on its water content. The wastewater treatment plant, with benefits from applying the sludge drying process, could set an example for other treatment plants to follow. Thus, the obiectives of reducing the amount of waste, relieving the storage problems of landfills, reducing the pollution from waste transportation and odor, and recycling the sludge for various uses can be achieved. |
參考文獻 |
〔1〕 何品晶、顧國維、李篤中,城市污泥處理與利用,科學出版社,北京,2003
〔2〕 李公哲譯,「污泥之處理及處置」,環境工程(增訂版),臺北:國立編譯館,1991
〔3〕 歐陽嶠暉,「下水道工程學」,臺北,2007。
〔4〕 陳見財,污泥加熱乾燥技術,廢水污泥減量技術手冊,2005
〔5〕 內政部營建署,公共污水下水道系統污泥去除重金屬等毒害物質及再利用於土壤改良資材之研究,內政部營建署,台北,2013
〔6〕 內政部營建署,全國都市污水處理廠污泥等廢棄物處置方式評估及工程規劃,內政部營建署,台北,2010
〔7〕 內政部營建署,地下水污泥處理再利用示範驗證計畫,內政部營建署,台北,2014
〔8〕 行政院環保署,鋼鐵基本工業、鋁熔煉業集塵灰及事業污泥清理查核專案工作計畫,行政院環保署,台北,2013
〔9〕 行政院環保署,污泥處理現況檢討及因應策略,行政院環保署,台北,2014
〔10〕 行政院環保署,100 年度有害事業廢棄物戴奧辛及重金屬管制之調查與評估專案研究計畫,行政院環保署,台北,2011
〔11〕 歐陽嶠暉,都市污水處理之污泥處理與資源化再利用之研究,內政部營建署,台北,1998
〔12〕 中興工程顧問股份有限公司,台北地區污水處理廠污泥處置規劃,中興工程顧問股份有限公司,台北,2002。
〔13〕 臺北市政府工務局衛生下水道工程處,迪化污水處理廠污泥減量規劃設計與監造技術顧問服務工作規畫報告,臺北市政府工務局衛生下水道工程處,台北,2008
〔14〕 櫻井義紀,東京多摩地區廢水處理計畫-污泥之處理及利用,日本,2005
〔15〕 黃子光,「水污泥灰合成中孔徑分子篩及表面改質吸附重金屬之研究,國立中央大學環境工程研究所,碩士論文,民國99年
〔16〕 潘時正,「下水污泥灰渣特性及應用於水泥砂漿之研究」,國立中央大學環境工程研究所,博士學位論文,民國91年
〔17〕 王寧沂,「下水污泥碳化之生命週期評估」,國立臺灣大學環境工程學研究所,碩士論文,民國101年
〔18〕 鄭宗杰,「都市生活污水污泥再利用於土壤可行性之研究」,朝陽科技大學環境工程與管理系,碩士論文,民國100年
〔19〕 王偉漢,「污泥高速旋風乾燥減量之研究-以北部某水資源回收中心設施為例」,國立臺北科技大學環境工程與管理研究所,碩士論文,民國101年
〔20〕 歐陽嶠暉、許鎮龍、藍文忠,「都市污水處理廠之污泥處理與資源化再利用之研究」,化工技術第94 期,106-113 頁,2001。
〔21〕 財團法人中技社綠色技術發展中心,「廢水污泥減容減量技術研析」,經濟部工業局,環保技術e報,第18期,2003
〔22〕 陳政澤、賴重光、李進成、陳毓生、黃財坤、陳政宗,「石化業污泥乾燥減量處理應用實例探討」,產業環境工程實務技術研討會,2003
〔23〕 江康鈺,「污泥乾燥處理技術介紹與應用案例」,逢甲大學環境工程與科學系,臺中,2004
〔24〕 行政院環保署,廢棄物清理法,行政院環保署,台北,2013
〔25〕 行政院環保署,水污染防治法,行政院環保署,台北,2015
〔26〕 行政院環保署,有害事業廢棄物認定標準,行政院環保署,台北,2009
〔27〕 行政院環保署,公告「指定廢棄物清理法第二條第一項第二款之事業」,行政院環保署,台北,2014
〔28〕 行政院環保署,事業廢棄物貯存清除處理方法及設施標準,行政院環保署,台北,2006
〔29〕 行政院環保署,土壤及地下水污染整治法,行政院環保署,台北,2010
〔30〕 內政部營建署,建築技術規則,內政部營建署,台北,2014
〔31〕 行政院交通部,公路工程施工規範,行政院交通部,台北,2014
〔32〕 中華民國國家標準CNS 382 R2002建築用普通磚,經濟部標準檢驗局,1978
〔33〕 中華民國國家標準CNS 8905 A2137混凝土空心磚,經濟部標準檢驗局,2000
〔34〕 中華民國國家標準CNS 12900 N4142肥料檢驗法(作物毒害試驗),經濟部標準檢驗局,1991
〔35〕 中華民國國家標準國家標準CNS 3691 A2046結構混凝土用之輕質粒料,經濟部標準檢驗局,1998
〔36〕 中華民國國家標準國家標準CNS 61 R2001卜特蘭水泥,經濟部標準檢驗局,2001
〔37〕 行政院環保署,環保標章產品項目,行政院環保署,2015
〔38〕 行政院農業委員會,肥料管理法,行政院農業委員會,2002
〔39〕 行政院農業委員會,肥料種類品目及規格,行政院農業委員會,2013
〔40〕 內政部營建署,全國公共污水處理廠資料管理系統http://sewagework.cpami.gov.tw/
〔41〕 行政院環保署,公有掩埋場暨垃圾轉運設施地方維護系統管理資訊平臺http://landfill.fundot.tw/#
〔42〕 ASTM C330-89 Standard Specification for Lightweight Aggregates for Structural Concrete,2005.
〔43〕 Flaga, A.,“Sludge drying”, Proceedings of Polish-Seminars., pp.73-82, Polishpp, 2005.
〔44〕 Li, H., Zou, S., Li, C., “Liming Pretreatment Reduces Sludge Build-Up on the DryerWall during Thermal Drying”, Drying Technology: An International Journal,Volume30, Issue 14,pp.1563-1569, 2012.
〔45〕 Ferrasse, J. H., Arlabosse, P., Lecomte, D., “Heat, momentum and mass transfer measurements in indirect agitated sludge dryer”, Drying Technology, Volume 20, Issue 4, pp.749–769, 2002.
〔46〕 Monzo, J., Paya, J., Borrachero, M. V., Corcoles, A., “Use of sewage sludge ash(SSA)-cement admixtures in motars”, Cement and Concrete Research, Vol. 26, pp. 1389-1398,1996.
〔47〕 Christiansen, K., “A Life Cycle Assessment of Sewage Sludge Treatment Options. Aalborg: Department of Development and Planning”, Aalborg University, 2008.
〔48〕 Frei, K. M., Cameron, D., Jasmin, S., P.R. Stuart, “Novel sludge drying process for cost-effective on-site sludge management”, Sludge, Volume 107, Issue 4,pp.47-53, 2006.
〔49〕 Tsang, K. R., Vesilind, P. A., ”Moisture distribution in sludge”, Water Science and Technology., pp.135-142, 1990.
〔50〕 Bennamoun, L., “Solar drying of wastewater sludge: A review”, Renewable and Sustainable Energy Reviews,Volume 16, Issue 1, pp. 1061–1073, January 2012.
〔51〕 Urbaniak, M., Hillebrand, B., “Sludge drying and granulation for further Top Their use”, Czestochowa, 2004.
〔52〕 Arlabosse, P., Chavez, S., Prevot, C., “Drying of municipal sewage sludge: from a laboratory scale batch indirect dryer to the paddle dryer”, Brazilian Journal of Chemical Engineering, Volume 22, No. 02, pp. 227 - 232, April - June, 2005.
〔53〕 Vesilind, P. A., ”Role of Water in Dewatering”, Water Environmental Research, pp.4-11, 1994.
〔54〕 Kim, Y. J., Choi, J. H., Kim, J. H., ” Production and effective utilization of carbonized sludge of industrial wastewater treatment plant”, Journal of the Chemical Society of Pakistan, 32, 7-12., 2010.
|