參考文獻 |
〔1〕 黃少廷、呂守陞(2002)。「預鑄工廠生產排程最適化模式之探討」,中華技術雜誌,56,P 77-104。
〔2〕 徐坤榮(2000)。「建築工程營建生產力之研究-以預鑄工法為例」,國立臺灣大學土木工程研究所碩士論文。
〔3〕 張兆宇(2009)。「預鑄廠生產儲運最佳化模式之研究」,國立中央大學土木工程研究所碩士論文。
〔4〕 王維志,林俊昌,汪俊男(2004)。「半預鑄工法運用於半導體廠房工程之效益分析」,營建管理季刊,夏季號,1-12。
〔5〕 Kieran, S., Timberlake, J. (2004). Refabricating Architecture. New York: McGraw-Hill.
〔6〕 Warzawski, A. (1984) .Production planning in prefabrication plant. Jounal of Build. Environment, 19 (2) 139-147.
〔7〕 Chan, W.T., Hu, H. (2001) . An application of genetic algorithms to precast production scheduling. Computers and Structures 79 1605-1616
〔8〕 Chan, W.T., Hu, H. (2002) . Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management, 128 (6) 513-521.
〔9〕 Leu ,S.S., Hwang, S.T. (2002). GA-based resource-constrained flow-shop scheduling model for mixed precast production. Jounal of Automation in Construction 11 439-452.
〔10〕 Ko, H. C., Wang ,S.F. (2010) .GA-based decision support systems for precast production planning . Jounal of Automation in Construction 19 , 907-916.
〔11〕 Augusto, T. D. A., Mounir, K. E. D., Antonio, M.C.M. (2012). A cost optimization-based design of precast concrete floors using genetic algorithms. Jounal of Automation in Construction 22 348-356.
〔12〕 翁敏欽(2008)。「房屋建築工程預鑄工法生產成本分析之研究」,國立臺灣大學土木工程研究所碩士論文。
〔13〕 趙俊宏(2012)。「應用精實六標準差於預鑄廠生產力改善」,國立臺灣大學土木工程研究所碩士論文。
〔14〕 Low, S.P. and Choong, J.C. (2001). Just-in-time management of pre-cast concrete component. Journal of Construction Engineering and Management. ASCE, 127 (6) 494-501.
〔15〕 Chan, W.T., Hao, H.(2002). Production scheduling for precast plants using a flow shop sequencing model. Journal of Computing in Civil Engineering. 16 (3) 165-174.
〔16〕 Chan, W.T., Zeng, Z.(2005). Rescheduling precast production with multiobjective optimization. Computing in Civil Engineering. conference paper.
〔17〕 施國銓(2010)。「營建專案供需議題之研究-以預鑄專案為例」,國立雲林科技大學工程科技研究所博士論文。
〔18〕 莊傳業(2010)。「營建業之精實供應鏈管理─以R公司之預鑄工程為例」,國立中央大學管理學院高階主管企管碩士論文。
〔19〕 葛清元(2008)。「預鑄構件吊裝順序展示輔助工具之研究」,國立臺灣大學土木工程研究所碩士論文。
〔20〕 陳宇淳(2006)。「預鑄工廠出貨緩衝之研究」,大業大學工業工程與科技管理學所碩士論文。
〔21〕 Ryan, D. M.(1992). The Solution of Massive Generalized Set Partitioning Problem in Aircrew Rostering. Journal of the Operational Research Society 43 (5) 459-467.
〔22〕 Langerman, J.J., Ehlers, E. M.(1992). Agent-based Airline Scheduling. Computers and Industrial Engineering 33 3-4 849-852.
〔23〕 Nobert, Y., Roy, J .(1998). Freight Handling Personnel Schedule at Air Cargo Terminals.Transportation Science 32 (2) 295-301.
〔24〕 Lucic, P., Teodorovic, D.(1998). A Fuzzy Set Theory Approach to the Aircrew Rostering Problem. Fuzzy Set and System. 95 (3) 261-271.
〔25〕 Lucic, P., Teodorovic, D.(1999). Simulated Annealing for the Multiobjective Aircrew Rostering Problem. Transportation Research Part A. 33 (1) 19-45.
〔26〕 Yan, S., Tu, Y. P.(1998). A Network Model for Airline Cabin Crew Scheduling. European Journal of Operational Research, 140 (3) 531-540.
〔27〕 Yan, S., Chang, J. C.(2002). Airline Cockpit Crew Scheduling. European Journal of Operational Research 136 (3) 501-511.
〔28〕 Yan, S., Tang, T.T., Tu , Y. P.(2002).Optimal Construction of Airline Individual Crew Pairings. Computers and Operations Research 29 (4) 341-363.
〔29〕 Yan, S. D., Yang, H. S., Chen, H.(2002). Airline Short-term Maintenance Manpower Supply Planning. Transportation Research Part A 38 (9-10) 615-642.
〔30〕 Yan, S., Lai, W.S.(2007). An optimal scheduling model for ready mixed concrete supply with overtime considerations. Automation in Construction 16 (6) 734?744.
〔31〕 Yan, S., Shih, Y. L.(2007). A time-space network model for work team scheduling after a major disaster. Journal of Chinese Institute of Engineers 30 (1) 63?75
〔32〕 Chen,Y., Reilly, K.D., Sprague, A.P., Guan, Z.(2006). SEQOPTICS: a protein sequence clustering system. BMC Bioinform 7 (4) 10.
〔33〕 Krishnapuram, R., Joshi, A., Yi, L.(1999).A fuzzy relative of the k-medoids algorithm with application to web document and snippet clustering. in IEEE International Fuzzy Systems Conferences. Seoul. Korea. 1281-1286.
〔34〕 Won, K.H., Goonjae, L., Sungho, L., Sunkuk, K.(2014). Algorithms for in-situ production layout of composite precast concrete members. Automation in Construction 41 50-59.
〔35〕 Mobasher, B., Cooley, R., Srivatstava, J.(1999). Creating adaptive web sites through usage-based clustering of URLs. in Knowledge and Data Enginnnring Workshop.
〔36〕 Bandyopadhyay, S., Maulik, U.(2002).Genetic clustering for automatic evolution of clusters and application to image classification. Pattern Recognition. Jun. 35 (6) 1197-1208.
?
〔37〕 Omran, M., Salman, A. Engelbrecht, A.(2005). Dynamic clustering using particle swarm optimization with application in unsupervised image classification. in Proc. 5th World Enformatika Conf. (ICCI). Prague. Czech Republic.
〔38〕 Han J.(2005). Data mining techniques. Proceedings of the 1996 ACM SIGMOD International Conference on Management of Data. Montreal Can. June 1996.
〔39〕 Gautam, G., Chaudhuri, B.B.(2004). A Novel Genetic Algorithm for Automatic Clustering. Pattern Recognition Letters. 25 173-187.
〔40〕 Chen, T.S., Lin, C.C., Chiu ,Y. H., Chen, R.C.(2006). Combined Density- and Constraint-based Algorithm for Clustering. In Proceedings of 2006 International Conference on Intelligent Systems and Knowledge Engineering.
〔41〕 黃俊英(1995)。「多變量分析」,五版,台北,中國經濟企業研究所。
〔42〕 Sua, M.C., Sua, S.Y., Zhao, Y.X.(2009). A swarm-inspired projection algorithm. The Journal of the Pattern Recognition Society. 42 2764-2786.
〔43〕 李悅綾(2012)。「建築投資業經營績效與聚類分群之評估分析」,國立台灣科技大學營建工程所碩士論文。
〔44〕 劉彥良(2010)。「資料探勘於不動產之分群應用-以台北市大安區為例」,國立台北教育大學資訊科學所碩士論文。
〔45〕 Agrawal, R., Gehrke, J., Gunopulos, D., Raghavan, P.(2006).Automatic subspace clustering of high dimensional data for data mining applications. Proceedings of the ACM SIGMOD International Conference on Management of Data. Seattle WA. United states. June.
〔46〕 蘇軾詠(2004)。「結合群體智慧與自我組織映射圖的資料視覺化研究」,國立中央大學資訊工程研究所碩士論文。
〔47〕 Han, J., Kamber, M.(2000).Data Mining:Concepts and Techniques. San Francisco. CA. USA:Morgan Kaufmann.
〔48〕 David, J., Heikki, M., Padhraic, S.(2001).Principles of Data Mining. MIT Press.
〔49〕 趙于翔(2007)。「以群體智慧為基礎的最佳化演算法及其應用」,國立中央大學資訊工程研究所博士論文。
〔50〕 Reynolds, C. W.(1987).Flocks, herds and schools: a distributed behavioral model. Computer Graphics. 21 (4) 25-34.
〔51〕 Heppner, F., Grenander, U.(1990). A stochastic nonlinear model for coordinated bird flocks. In S. Krasner. Ed. The Ubiquity of Chaos. AAAS Publications. Washington. DC.
〔52〕 Wilson, E. O.(1975). Sociobiology: the new synthesis. Belknap Press. Cambridge. MA.
〔53〕 陳韋向(2014)。「營建專案人力配置最佳化及參與時序模式建立」,國立中央大學資訊工程研究所博士論文。
〔54〕 Chen, J.H., Su, M. C., Annuerine, B.(2016).Exploring and weighting features for financially distressed construction companies using Swarm Inspired Projection algorithm. Advanced Engineering Informatics. 30 (3) 376-389.
|