參考文獻 |
[1] Asano, M. and Ohta, H., “Single Machine Scheduling Using Dominance Relation to Minimize Earliness Subject to Ready and Due times,” International Journal of Production Research, Vol.44, pp.35-43 (1996).
[2] Baker, K.R., “Heuristic Procedures for Scheduling Job Families with Setups and Due Dates,” Naval Research Logistics, Vol.46, pp.978-991 (1999).
[3] Barnes, J.W. and Vanston, L.K., “Scheduling Jobs with Linear Delay Penalties and Sequence Dependent Setup Costs,” Operations Research, Vol.29, pp.146-160 (1981).
[4] Bianco, L., Ricciardelli, S., Rinaldi, G. and Sassano, A., “Scheduling Tasks with Sequence-Dependent Processing Times,” Naval Research Logistics, Vol.35, pp.177-184 (1988).
[5] Bruno, J. and Downey, P., “Complexity of Task Sequencing with Deadline, Setup Times and Changeover Costs,” SIAM Journal on Computing, Vol.7, pp.393-404 (1978).
[6] Burstall, R.M., “A Heuristic Method for a Job-Shop Scheduling Problem,” Operations Research, Vol.17, pp.291-304 (1966).
[7] Buzacott, J.A. and Dutta, S.K., “Sequencing Many Jobs on a Multi-Purpose Facility,” Naval Research Logistics Quarterly, Vol.18, pp.75-82 (1971).
[8] Conway, R.W., Maxwell, W.L. and Miller, L.W., Theory of Scheduling, Addison Wesley, Massachusetts, (1967).
[9] Driscoll, W.C. and Emmons, H., “Scheduling Production on One Machine with Changeover Costs,” IIE Transactions, Vol.9, pp.388-395 (1997).
[10] Farn, C.D. and Muhlemann, A.P., “The Dynamic Aspects of a Production Scheduling Problem,” International Journal of Production Research, Vol.17, pp.15-21 (1979).
[11] Feo, T.A., Sarathy, K. and McGahan, J., “A Grasp for Single Machine Scheduling with Sequence Dependent Setup Costs and Linear Delay Penalties,” Computers & Operations Research, Vol.23, pp.881-895 (1996).
[12] Gilmore, P.C. and Gomory, R.E., “Sequencing a One-state Variable Machine; A Solvable Case of the Traveling Salesman Problem,” Operations Research, Vol.12, pp.655-679 (1964).
[13] Glover, F., “Tabu Search-Part I,” ORSA Journal on Computing, Vol.1, pp.4-32 (1990).
[14] Glover, F., “Tabu Search-Part II,” ORSA Journal on Computing, Vol.2, pp.4-32 (1990).
[15] Haynes, R.D., Komar, C.A. and Byrd, J., “The Effectiveness of Three Heuristic Rules for Job Sequencing in a Single Production Facility,” Management Science, Vol.9, pp.575-580 (1973).
[16] He, W. and Kusiak, A., “Scheduling Manufacturing Systems,” Computers in Industry, Vol.20, pp.163-175 (1992).
[17] Holland, J.H., “Genetic Algorithms and the Optimal Allocation of Trials,” SIAM Journal on Computing, Vol.2, pp.99-105 (1973)
[18] Kaneko, E., Liquid Crystal Display, KTK Scientific, Tokyo, (1987).
[19] Kim, S.Y., Lee, Y.H. and Agnihotri, D., “A Hybrid Approach to Sequencing Jobs Using Heuristic Rules and Neural Networks,” Production Planning & Control, Vol.6, pp.445-454 (1995).
[20] Kirckpatrick, S., Gelatt, C.D. and Vecchi, M.P., “Optimization by Simulated Annealing,” Science, Vol.220, pp.671-689 (1983).
[21] Krajewski, L.J., et al. “Kanban, MRP, and shaping the manufacturing environment,” Manage Science, Vol.33, pp.39-57 (1987).
[22] Kusiak, A. and Finke, G., “Modeling and Solving the Flexible Forging Module Scheduling Problem,” Engineering Optimization, Vol.12, pp.1-12 (1987).
[23] Laguna, M., Barnes, J.W. and Glover, F.W., “Tabu Search Methods for a Single-Machine Scheduling Problem,” Journal of Intelligent Manufacturing, Vol.2, pp.63-74 (1991).
[24] Lawler, E.L., Lenstra, J.K., Rinnooy, K.A. And Shmoys, D.B., Sequencing and Scheduling: Algorithms and Complexity. In Logistics of Production a-nd Inventory, Amsterdam, Netherlands: North Holland, (1993).
[25] Lee, Y.H., Bhaskaran, K. and Pinedo, M., “A Heuristic to minimize the Total Weighted Tardiness with Sequence Dependent Setups,” IIE Transactions, Vol.29, pp.45-52 (1997).
[26] Lockett, A.G. and Muhlemann, A.P., “A Scheduling Problem Involving Sequence Dependent Changeover Costs,” Operations Research, Vol.20, pp.895-902 (1972).
[27] Monma, C.L. and Potts, C.N., “On the Complexity of Scheduling with Batch Setup Times,” Operations Research, Vol.37, pp.798-804 (1989).
[28] Moore, J.E., “An Algorithm for a Single-Machine Scheduling Problem with Sequence-Dependent Setup Times and Scheduling Windows,” IIE Transactions, Vol.7, pp.35-41 (1975).
[29] Ovacik, I.M. and Uzsoy, R., “Rolling Horizon Algorithms for a Single-Machine Dynamic Scheduling Problem with Sequence-Dependent Setup Times,” International Journal of Production Research, Vol.32, pp.1243-1263 (1994).
[30] Parker, R.G.., Deterministic Scheduling Theory, Chapman and Hall, London, (1995).
[31] Picard, J.C. and Queyranne, M., “The Time-Dependent Traveling Salesman Problem and its Application to The Tardiness Problem in One Machine Scheduling,” Operations Research, Vol.26, pp.86-110 (1978).
[32] Pinedo, M., Scheduling: Theory, algorithms, and systems, Prentice Hall, New Jersey, (1995).
[33] Rubin, P.A. and Ragatz, G.L., “Scheduling in a Sequence Dependent Setup Environment with Genetic Search,” Computers & operations research, Vol.22, pp.85-99 (1995).
[34] Sielken, R.L. Jr., “Sequencing with Set-up Costs by Zero-One Mixed Integer Linear Programming,” IIE Transactions, Vol.8, pp.369-371 (1976).
[35] Smith, W.E., “Various Optimizers for Single Stage Production,” Naval Research Logistics Quarterly, Vol.3, pp.59-66 (1956).
[36] Taha, H., “Sequencing by Implicit Ranking and Zero-One Polynomial Programming,” IIE Transactions, Vol.3, pp.299-301 (1971).
[37] Tan, K.C. and Narasimhan, R., “Multi-Objective Sequencing with Sequence Dependent Setup Times,” International Journal of Operations and Quantitative, Vol.3, pp.69-84 (1997).
[38] ten Kate, H.A., Wijngaard, J. and Zijm, W.H.M. “Minimizing Total Earliness, Tardiness, and Setup Costs,” School of Management and Organization, University of Groningen, Holland, Research Report No. RR, pp.1991-2012, (1991).
[39] Uzsoy, R., Martin-Vega, L.A., Lee, C.Y. and Leonard, P.A., “Production Scheduling Algorithms for a Semiconductor Test Facility,” IEEE transactions on semiconductor manufacturing, Vol.4, pp.270-280 (1991).
[40] Uzsoy, R., Lee, C. and Martin-Vega, A., “Scheduling Semiconductor Test Operations: Minimizing Maximum Lateness and Number of Tardy Jobs on a Single Machine,” Naval Research Logistics, Vol.39, pp.369-388 (1992).
[41] White, C.H. and Wilson, R.C., “Sequence Dependent Setup Times and Job Sequencing,” International Journal of Production Research, Vol.15, pp.191-202 (1977).
[42] Woodruff, D.L. and Spearman, M.L., “Sequencing and Batching for Two Classes of Job with Deadlines and Setup Times,” Production and Operations Management, Vol.1 pp.87-102 (1992).
[43] Yang, W.H. and Liao, C.J., “Survey of Scheduling Research Involving Setup Times,” International Journal of Systems Science, Vol.30, pp.143-155 (1999). |