參考文獻 |
一、英文部分
〔1〕Li, Y. F., and Sung, Y. Y., (2003). “Seismic Repair and Rehabilitation of the Shear Failure Circular Bridge Column Using CFRP Jacketing.” Canadian Journal of Civil Engineering, Vol. 30, No. 5, pp. 819-829.
〔2〕Li, Y. F., and Sung, Y. Y., (2004). “A Study on the Shear Failure Circular Sectioned Bridge Column Retrofitted by Using CFRP Jacketing.” Journal of Reinforced Plastic and Composites, Vol. 23, No. 8, pp. 811-830.
〔3〕Li, Y.-F., Y.-J. Lin, C.-W. Chen, and C.-T. Lin, (2007). “Theoretical and Experimental Studies on the As-built and Repaired Rehabilitated RC Frames,” Canadian Journal of Civil Engineering, Vol. 34, No. 8, pp. 923-933.
〔4〕Li, Y.-F., and Kan, S.-T., (2011). “A Study on the Three-Point Bending Test and Mechanical Behavior of the Hybrid FRP Beam,” 2011 ICFMEIA, Bali Island, Indonesia, August 4-5.
〔5〕Li, Y.-F., Hsu, T.-H., Wu, C.-H., and Badjie, S., (2012). “Three-Point Bending Test and Finite-Element Analysis on FRP Bridge Deck,” 9th International Conference on Urban Earthquake Engineering and 4ACEE , paper ID 07- 091, page 189, Japan, Tokyo, March 4-8.
〔6〕Badri, M. A. (2001). “A combined AHP–GP model for quality control systems. ” International Journal of Production Economics, 72(1), 27-40.
〔7〕Barbarosoglu, G., Yazgac, T. (1997),“An application of the analytic hierarchy process to the supplier selection problem,” Production and Inventory Management Journal, 38 (1), 14-21.
〔8〕Belton, V., & Gear, T. (1983). “On a short-coming of Saaty′s method of analytic hierarchies. ” Omega, 11(3), 228-230.
〔9〕Chen, S. H and Hsieh, C. H. (2000), “Representation ranking, distance, and similarity of L-R type fuzzy number and application”, Australian Journal of Intelligent Processing System, 6(4), 217-229.
〔10〕Choi, T. Y. and Hartley, J. L.(1996), “An exploitation of supplier selection practices across the supply chain,” Journal of Operations Management 14, 333-343.
〔2〕Christopher, M.(1992),“logistics and supply chain management: strategies for reducing cost and Improves service, ” London: Financial Times/Pitman.
〔11〕Christopher, M.(1998), “ logistics and supply chain management: strategies for reducing cost and Improves service, ” London: Financial Times/Pitman.
〔12〕Cooper, M. C. and Ellram, L. M.(1993), “Characteristics of supply chain management and the implication for purchasing and logistics strategy,” The International Journal of Logistics Management, vol.4, no.2, pp.13-24.
〔13〕Cooper, M. C., Lambert, D. M. and Pagh, J. D.(1997), “Supply chain management: more than a new name for logistics,” International Journal of Logistics Management, vol.8, no.1, pp.1-14.
〔14〕Dickson, G.W. (1966), “An analysis of vender selection systems and decisions, ” Journal of Purchasing 2(1), 5-17.
〔15〕Ding, J. F. (2006). “Using fuzzy AHP to investigate key factors influencing the quality of service delivery system for port of Kaohsiung. ” Advances in Fuzzy Sets and Systems, 1(1), 63-81.
〔16〕Dowlatshahi, S., (2000), “Designer-buyer-supplier interface: theory versus practice,” International Journal of Production Economics, 63(2),111-130.
〔17〕Ellram, L. M., Lambert, D. M. and Stock, J. R.(1990), “Fundamentals of logistics management, ” McGraw-Hill.
〔18〕Ellram, L. M., Lambert, D. M. and Stock, J. R.(1991), “Fundamentals of logistics management, ” McGraw-Hill.
〔19〕Ellram, L. M., Lambert, D. M. and Stock, J. R.(1998), “ Fundamentals of logistics management, ” McGraw-Hill.
〔20〕Handfield, C. M., E. L. Nichols.,(1999). “Introduction to supply chain management, ”prentice-hall, New York.
〔21〕Houshyar, A. and David, L. (1992). “A systematic selection procedure,” Computer and Industrial Engineering, 23(1-4),173-176
〔22〕Jones, T. C. and Riley, D. W.(1985), “Using inventory for competitive advantage through supply chain management,” International Journal of Physical Distribution and Materials Management, vol.15, no.5, pp.16-26
〔23〕Kaplan, R. S. & Norton D.P. (1992). “The balanced scorecard - measures that drive performance. ” Harvard Business Review 70(7/8): 172-180.
〔24〕Kaplan R.S., & Norton D.P. (1996). “Using the balanced scorecard: as a strategic management system, ”Harvard Business Review, jan.-feb.
〔25〕Kaplan, R.S. (2000). “Overcoming the barriers to balanced scorecard use in the public sector. ”Boston: Harvard Business School.
〔26〕Millet, I., & Harker, P. T. (1990). “Globally effective questioning in the analytic hierarchy process. ” European Journal of Operational Research, 48(1), 88-97.
〔27〕Mohanty, R. P. and S. G. Deshmukh, (1993), “Using of analytic hierarchic process for evaluating sources of supply,” International Journal of Physical Distribution and Logistics Management, 23(3),22-28.
〔28〕Oliver, R. K. and Webber, M. D.(1982), “Supply-chain management: logistics catches up with strategy ” , Outlook, cit. Martin Christopher, Logistics, The Strategy Issues, London: Chapman and Hall..
〔29〕Ross, D. F.(1997), “Competing through supply chain management: creating market-winning strategies through supply chain partnerships”, London: Chapman & Hall.
〔30〕Saaty, T. L. (1980). “The analytic hierarchy process: planning”. Priority Setting. Resource Allocation, MacGraw-Hill, New York International Book Company, 287.
〔31〕Sarkis, J., Talluri, S., (2002), “A model for strategic supplier selection”, Journal of Supply Chain Management,38(1),18-28.
〔32〕Simchi-Levi, D., Kaminsky, P. and Simchi-Levi, E.(2000), “Designing and managing the supply chain” , McGraw-Hill Companies
〔33〕Stevens, G. C.(1989),“Integrating the supply chains,” International Journal of Physical Distribution and Materials Management, vol.8, no.8, pp.3-8
〔34〕Stevenson, William J., (1999), “Production/operations management”, 6th ed., McGraw-Hill, New York.
〔35〕Watts, C. A., Kim, K. Y. and Hahn, C. K.,(1992), “Linking purchasing to corporate competitive strategy,” International Journal of Purchasing and Materials Management, spring 1995, 31( 2), 3-8.
〔36〕Weber, C. A., Current, J. R. and Benton, W. C., (1991), “Vendor selection criteria and methods,”European Journal of Operational Research, 50, 2-18.
〔37〕Yahya, S., & Kingsman, B. (2002). “Modelling a multi-objective allocation problem in a government sponsored entrepreneur development programme”. European Journal of Operational Research, 136(2), 430-448.
〔38〕Bank, L.C., (2006). “Composite for Construction: Structural Design with FRP Materials,” John Wiley & Sons, Inc.
二、中文部分
〔1〕梁國聖(2017),國內統包制度履約效率之研究-以公共建築工程為核心。國立中央大學營建管理研究所碩士論文。
〔2〕謝璧如(2013),統包工程報價風險研究-以公共工程為核心。國立中央大學營建管理研究所碩士論文。
〔3〕陳姿伶(2012),統包工程管理模式之研究-以整合FIDIC銀版與PMBOK為核心。國立中央大學營建管理研究所碩士論文。
〔4〕劉子豪(2012),以供應鏈管理提升統包工程專案採購績效之研究。國立中央大學營建管理研究所碩士論文。
〔5〕曾國棟(2011),統包工程範疇界定差異及其衍生契約變更爭議之研究。國立中央大學營建管理研究所碩士論文。
〔6〕丁吉峰、梁金樹(2006)。應用模糊多準則決策評選高雄港關鍵能力之研究。航運季刊,15(1)。
〔7〕卓宏儒(2008)。金屬材料業供應鏈管理績效之探討-平衡計分卡觀點。成功大學高階管理碩士在職專班碩士論文。
〔8〕周文萍(2014)。統包工程業供應商評選之研究。國立交通大學管理學院管理科學學程碩士班碩士論文。
〔9〕林真琪(2014)。利用平衡計分卡發展經銷商績效指標。銘傳大學管理學院高階經理碩士學程在職專班碩士論文。
〔10〕邱旭生(2007)。以平衡計分卡為基之供應商評核。逢甲大學經營管理碩士在職專班碩士論文。
〔11〕張有恆(1998)。模糊德菲層級分析法。模糊系統學刊,4(1)。
〔12〕張有恆、徐村和(1993)。模糊度量 AHP 法—交通運輸計畫評估新模式。中華民國第一屆模糊理論與應用研討會。
〔13〕張春彭(2012)。建築石材業之綠色供應商評選:應用層級分析法。南華大學企業管理系管理科學碩士論文。
〔14〕陳怡和(1998)。供應商管理標竿之建立與分析..以台灣筆記型電腦產業為例。元智大學工業工程研究所碩士論文。
〔15〕陳彥廷(2016)。應用層級分析法於綠色建材供應商評選模式之研究。國立高雄應用科技大學工業工程與管理系碩士在職專班碩士論文。
〔16〕陳家祥、許吉男、張厚瑩(1999)。台灣零售通路供應鏈管理應用特性與展望。1999國際物流研討會論文集。
〔17〕黃智偉(2000)。供應鏈管理下供應商選擇評估之研究—以台灣地區中衛體系之汽、機車、電腦資訊業為例。雲林科技大學工業工程與管理研究所碩士論文。
〔18〕萬鴻欽(2013)。高科技廠房綠建材供應商評選模式之探討。中華大學土木工程學系碩士班碩士論文。
〔19〕葉崇茂(2011)。以平衡計分卡為基之供應商自我評量-以IC封裝業供應商為例。逢甲大學經營管理碩士在職專班碩士論文。
〔20〕賈平(2011)。供應鏈管理。北京市:清華大學出版社。
〔21〕劉建良(2004)。以商業智慧觀點探討電腦週邊產品ODM代工供應商關鍵評選因素。實踐大學企業管理研究所碩士論文。
〔22〕劉嘉惠(2008)。VoIP產業代工廠商評選要素之研究。逢甲大學經營管理碩士在職專班碩士論文。
〔23〕黎漢林、許景華、李明純、張李志平(2000)。供應鏈管理與決策─最佳化方法之運用。台北:儒林。
〔24〕盧舜年、鄒坤霖(2002)。供應鏈管理的第一本書: 打破企業間的藩籬。台北:城邦。
〔25〕鍾文毅(2003)。利用平衡計分卡發展供應鏈管理關鍵績效指標-德菲法研究。國立中正大學資訊管理學系碩士論文。
〔26〕簡家貴(2016)。分析及建立以標竿學習規劃為導向之供應商評選機制。逢甲大學工業工程與系統管理學系碩士論文。
〔27〕蘇雄義(2000)。物流與運籌管理:觀念機能與整合。台北市:華泰。
〔28〕李有豐、朱育正、張國鎮(2002),碳纖維高分子複合材料於圓型RC橋柱撓曲破壞耐震補強之理論與實驗驗證,中國土木水利工程學刊,第14卷,第2期,第343-351頁。
〔29〕李有豐、林至聰、洪明中、徐增興(2009),CFRP棒應用於高強度混凝土梁構件之力學行為研究,結構工程,第24卷,第2期,第33-54頁。
〔30〕李有豐、彭添富、張寬勇、陳威杰(2001),碳纖維強化高分子複合材料(CFRP)補強RC構件設計之研究,結構工程,第16卷,第2期,第3-14頁。 |