參考文獻 |
[1] CNN website, 2014, http://edition.cnn.com/2014/05/14/world/asia/south-china-sea-drill ing-duplicate-2/index.html
[2] Appledaily website, 2016, http://www.appledaily.com.tw/appledaily/article/finance/20160323/37123407/
[3] New York Times website, 2016, https://www.nytimes.com/2016/07/01/world/asia/vietnam-formosa-ha-tinh-steel.html? mcubz=3
[4] Dawood, N., 1998. Estimating Project and Activity Duration: A Risk Management Approach Using Network Analysis. Construction Management and Economics. 16(1), 41‒48.
[5] Elkjaer, M., 2000. Stochastic Budget Simulation. International Journal of Project Management. 18(2), 139‒147.
[6] Ye, S., Tiong, L.K.R., 2000. NPV-At-Risk Method in Infrastructure Project Investment Evaluation. Journal of Construction Engineering and Management. 126(3), 22733.
[7] Baccarini, D., Archer, R., 2001. The Risk Ranking of Projects: a Methodology. International Journal of Project Management. 19(3), 139145.
[8] Chapman, R.J., 2001. The Controlling Influences on Effective Risk Identification and Assessment for Construction Design Management. International Journal of Project Management. 19(3), 147160.
[9] Mak, S., Picken, D., 2000. Using Risk Analysis to Determine Construction Project Contingencies. Journal of Construction Engineering and Management. 126(2), 130136.
[10] Kangari, R., Riggs, L.S., 1989. Construction Risk Assessment by Linguistics. IEEE Transactions on Engineering Management. 36(2), 126131.
[11] Paek, J.H., Lee, Y.W., Ock, J.H., 1993. Pricing Construction Risk: Fuzzy Set Application. Journal of Construction Engineering and Management. ASCE. 119(4), 743755.
[12] Tah, J.H.M., Carr, V., 2000. Information Modeling for Project Risk Analysis and Management Engineering. Construction and Architectural management. 17(2), 107119.
[13] Tah, J.H.M., Carr, V., 2001. Knowledge-Based Approach To Construction Project Risk Management. Journal of Computing in Civil Engineering. ASCE. 15(3), 170177.
[14] Zadeh, L.A., 1965. Fuzzy sets. Information and Control. 8(2), 33853.
[15] Chen, S.J., Hwang, C.L., 1992. Fuzzy Multiple Attribute Decision Making Method and Applications. Springer-Verlag, New York.
[16] Lu, S.T., Hsieh, T.Y., Lee, J.S., Tzeng, G..H., 2001. A Decision Support System for Planning and Design Tender Selection in Public Buildings. Proceedings of the First International Conference on Electronic Business (ICEB2001). Hong Kong, 215217.
[17] Lu, S. T., Tzeng, G.H., 2002. A Decision Support System for Construction Project Risk Assessment. Proceedings of the Second International Conference on Electronic Business (ICEB2002). Taipei, Taiwan, 255−257.
[18] Rebiasz, B., 2007. Fuzziness and randomness in investment project risk appraisal. Computers & Operations Research. 34(1), 199–210.
[19] Sadiq, R, Kleiner, Y. Rajani, B., 2007. Water Quality Failure in Distribution Networks- Risk Analysis Using Fuzzy Logic and Evidential Reasoning. Risk Analysis. 27(5), 1381‒1394.
[20] Wang, T. C. and Chen, Y. H., 2008. Applying fuzzy linguistic preference relations to the improvement of consistency of fuzzy AHP, Information Sciences, 178(19), 3755‒3765.
[21] Opricovic, S., Tzeng, G.H., 2002. Multicriteria planning of post-earthquake sustainable reconstruction. Computer-Aided Civil and Infrastructure Engineering. 17(3), 211‒220.
[22] Opricovic, S., Tzeng, G.H., 2004. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. European Journal of Operational Research 156(2), 445‒455.
[23] Opricovic, S., Tzeng, G.H., 2007. Extended VIKOR method in comparison with outranking methods. European Journal of Operational Research. 178(2), 514-529.
[24] Sanayei, A., Mousavi, S. F., Yazdankhah, A., 2010, Group decision making process for supplier selection with VIKOR under fuzzy environment. Expert Systems with Applications. 37(1), 24‒30.
[25] Shemshadi, A., Shirazi, H., Toreihi, M., Tarokh, M.J., 2011, A fuzzy VIKOR method for supplier selection based on entropy measure for objective weighting. Expert Systems with Applications. 38(10), 12160–12167.
[26] Chang, T. H., 2014, Fuzzy VIKOR method: A case study of the hospital service evaluation in Taiwan. Information Sciences. 271(1), 196‒212.
[27] Willett A. H, The Economic Theory of Risk and Insurance, Published for THE S. S. Huebner Foundation for Insurance Education University of Pennsylvania by Richard D. Irwin, Inc., Homewood, Illinois, 1951. (first published in 1901 By The Columbia University Press)
[28] Knight, F. H., 1964, Risk, Uncertainty and Profit, Augustus M. Kelley, Bookseller. (first published in 1921 By Sentry Press, New York)
[29] Williams, C. A. Jr. and Heins, R. M., Risk Management and Insurance, McGraw-Hill Book Company, 1981. (first published January 1st 1971)
[30] Liu, H., Research on the risk management of overseas investment project. Master thesis of Liaoning University of Science and Technology, 2011.
[31] Cao, X., Research on Risk Assessment and Control of Overseas Investment Project, Master thesis of Institute of Systems Engineering, Southeast University, 2006
[32] Zhu, X., The risk of China′s foreign direct investment and its precaution system, Doctoral dissertation of Wuhan University, 2016.
[33] Lu, S.T., 2010. Using the fuzzy multiple criteria decision making approach for risk evaluation on investment of overseas project, Proceedings of the Ninth International Conference on Machine Learning and Cybernetics. 4, 20312036
[34] Wideman, R.M., 1986. Risk Management. Project Management Journal. 17(4), 2026.
[35] Raftery, J., 1994. Risk Analysis in Project Management. E&FN Spon, London.
[36] Zhi, H., 1995. Risk management for overseas construction project. International Journal of Project Management. 13(4), 23137.
[37] Jovanovic, P., 1999, Application of sensitivity analysis in investment project evaluation under uncertainty and risk. International Journal of Project Management. 17(4), 217‒222.
[38] Hastak, M., Shaked, A., 2000. ICRAM-1:Model for International Construction Risk Assessment. Journal of Management in Engineering. 16(1), 5969.
[39] Doumpos, M. and Zopounidis, C., 2001. Assessing financial risks using a multicriteria sorting procedure: the case of country risk assessment. Omega. 29(1), 97-109.
[40] Ahmed, Z. U., Mohamad, O., Tan, B., Johnson, J. P., 2002. International risk perceptions and mode of entry: a case study of Malaysian multinational firms. Journal of Business Research. 55(10), 805– 813.
[41] He, Y. and Long, F., 2003. Market expansion versus cost reduction: a financial analysis of foreign direct investment advantages for multinational enterprises. Japan and the World Economy. 15(4), 407–417.
[42] Haley, U.C.V., 2003. Assessing and controlling business risks in China. Journal of International Management. 9(3), 237–252.
[43] Oetzel, J., 2005. Smaller may be beautiful but is it more risky? Assessing and managing political and economic risk in Costa Rica. International Business Review. 14(6), 765–790.
[44] Fedderke, J. W. and Romm, A. T., 2006. Growth impact and determinants of foreign direct investment into South Africa. 1956-2003, Economic Modelling. 23(6), 738–760.
[45] Dikmen, I. Birgonul, M. T., 2006. An analytic hierarchy process based model for risk and opportunity assessment of international construction projects. Canadian Journal of Civil Engineering. 33(1), 58–68.
[46] Shih, S., 2006, A Decision Model Regarding Foreign Direct Investment. Journal of Technology Management. 11(2), 127-154.(in Chinese)
[47] Busse, M., Hefeker, C., 2007. Political risk, institutions and foreign direct investment. European Journal of Political Economy. 23(2), 397–415.
[48] Hwang, C.L. and Yoon, K., 1981. Multiple Attribute Decision Making: Methods and Applications. Springer-Verlag, New York.
[49] Mon, D.L., Cheng, C.H., Lin, J.C., 1994. Evaluating weapon system using fuzzy analytic hierarchy process based on entropy weight. Fuzzy Sets and Systems. 62(2), 127134.
[50] Saaty, T.L., 1977. A Scaling Method for Priorities in Hierarchical Structures. Journal of Mathematical Psychology. 15(3), 234281.
[51] Saaty, T.L., 1980. The Analytic Hierarchy Process. McGraw-Hill, New York.
[52] Buckley, J.J., 1985. Fuzzy Hierarchical Analysis. Fuzzy Sets and Systems. 17(1), 233247.
[53] Zeng, J.; An, M.; Smith, N. J. 2007. Application of a fuzzy based decision making methodology to construction project risk assessment. International Journal of Project Management. 25(6), 589–600.
[54] Zayed, T.; Amer, M.; Pan, J. 2008. Assessing risk and uncertainty inherent in Chinese highway projects using AHP. International Journal of Project Managemen.t 26(4): 408–419.
[55] Zolfani, S.H., Sedaghat, M., Zavadskas, E.K., 2012. Performance Evaluating of Rural ICT Centers (Telecenters), Applying Fuzzy AHP, SAW-G and TOPSIS Grey, A Case Study in Iran. Technological and Economic Development of Economy. 18(2), 364–387.
[56] Zavadskas, E. K.; Vainiūnas, P.; Turskis, Z.; Tamošaitienė, J. 2012. Multiple criteria decision support system for assessment of projects managers in construction. International Journal of Information Technology & Decision Making. 11(2), 501–520.
[57] Herrera-Viedma, E., Herrera, E., Chiclana, F. and Luque, M., 2004. Some issues on consistency of fuzzy preference relations. European Journal of Operational Research. 154(1), 98-109.
[58] Zadeh, L.A., 1975. Concept of A Linguistic Variable and Its Application to Approximate Reasoning, Parts 1, 2 and 3. Information Sciences. 8(2), 199-49; 8(3), 30157, 9(1), 43-80.
[59] Chen, L.Y., Wang, T.C., 2009. Optimizing partners′ choice in IS/IT outsourcing projects: The strategic decision of fuzzy. VIKOR. International Journal of Production Economics. 120(1), 233-242.
[60] Shiu, J. Y., Lu, S. T., Chang, D. S. and Wu, K. W., 2016, Fuzzy multicriteria decision-making tools for selecting a professional property management company. International Transactions in Operational Research. Article in press, 2016.10.21 online. DOI: 10.1111/itor.12356.
[61] Lu, S. T., Yu, S. H. and Chang, D. S., 2014. Using Fuzzy Multiple Criteria Decision Making Approach for Assessing the Risk of Railway Reconstruction Project in Taiwan. The Scientific World Journal. Volume 2014, Article ID 239793.
[62] Duckstein, L., Opricovic, S., 1980. Multiobjective optimization in river basin development. Water Resources Research. 16 (1), 14–20.
[63] Saaty, T.L., 1996, Decision Making with Dependence and Feedback: The Analytic Network Process. 1st, Pittsburgh, PA: RWS Publications.
[64] Wu, W. W. and Lee, Y. T., 2007, Selecting knowledge management strategies by using the analytic network process. Expert Systems with Applications. 32(3), 841‒847.
[65] Wu, W. Y., Sukoco, B. M., Li, C. Y., and Chen, S. H., 2009. An integrated multi-objective decision-making process for supplier selection with bundling problem. Expert Systems with Applications. 36(2), 2327‒2337.
[66] Tzeng, G. H., Chiang, C. H., and Li, C. W., 2007. Evaluating intertwined effects in e-learning programs: a novel hybrid MCDM model based on factor analysis and DEMATEL. Expert Systems with Applications. 32(4), 1028-1044.
[67] Liou, J. J. H., Tzeng, G. H., and Chang, H. C., 2007. Airline safety measurement using a hybrid model. Air Transport Management. 13(4), 243‒249.
[68] Verma, R. K., 2014. Implementation of Interpretive Structural Model and Topsis in Manufacturing Industries for Supplier Selection. Industrial Engineering Letters. 4(5), 1‒8.
[69] Tsui, C.W. and Wen, U.P., 2014. A Hybrid Multiple Criteria Group Decision-Making Approach for Green Supplier Selection in the TFT-LCD Industry. Mathematical Problems in Engineering. Volume 2014, Article ID 709872.
[70] Brans, J.-P., Vincke, P. and Mareschal, B., 1986, How to select and how to rank projects: the PROMETHEE method. European Journal of Operational Research. 24(2), 228-38.
|