English |
正體中文
|
简体中文
|
Items with full text/Total items : 78852/78852 (100%)
Visitors : 36057632 Online Users : 366
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by
NTU Library IR team.
Scope
All of NCUIR
College of Earth Sciences
College of Hakka Studies
Engineering College
College of Liberal Arts at National Central University
College of Science All rights reserved
college of Health Sciences and Technology
Research Center
School of Management at National Central University
Office of Teaching Centers
administration
College of Electrical Engineering & Computer Science
Tips:
please add "double quotation mark" for query phrases to get precise results
please goto advance search for comprehansive author search
Adv. Search
Home
‧
Login
‧
Upload
‧
Help
‧
About
‧
Administer
NCUIR
>
Items for Author
Loading...
Category
Loading community tree, please wait....
Year
Loading year class tree, please wait....
Items for Author "楊智斌"
Return to Browse by Author
Showing 19 items.
Collection
Date
Title
Authors
Bitstream
[營建管理研究所 ] 研究計畫
2016-03-29
以浮時為基礎的時程延遲分析方法;Float-Based Schedule Delay Analysis Method
楊智斌
[營建管理研究所 ] 研究計畫
2016-08-31
結合BIM技術之時程延遲分析技術研發;Development of a Schedule Delay Analysis Approach Integrated with Bim Technique
楊智斌
[營建管理研究所 ] 研究計畫
2016-12-31
機關辦理公共工程導入建築資訊建模(BIM)技術
楊智斌
[營建管理研究所 ] 研究計畫
2018-08-01
結合BIM技術之時程延遲分析技術研發 ;Development of a Schedule Delay Analysis Approach Integrated with Bim Technique
楊智斌
[營建管理研究所 ] 研究計畫
2018-12-19
結合BIM技術之時程延遲分析技術研發;Development of a Schedule Delay Analysis Approach Integrated with Bim Technique
楊智斌
[營建管理研究所 ] 研究計畫
2019-02-21
地方政府建築資訊建模(BIM)圖資交付平台規劃研究;A Study on BIM Documents Delivery Platform Planning for Local Government
楊智斌
;
周宏宇
[營建管理研究所 ] 研究計畫
2020-01-13
結合EVM/ESM/EDM方法之時程遲延分析技術之研究;Developing Schedule Delay Analysis Methods Based on Evm/Esm/Edm Approaches
楊智斌
[土木工程學系 ] 研究計畫
2020-12-08
建築工程應用BIM所需資源共享平台規劃研究;A Study on Platform Planning of BIM Resources for Executing Building Projects
楊智斌
;
林子軒
[營建管理研究所 ] 研究計畫
2021-03-25
國內建築工程推廣應用預鑄技術及獎勵機制研究;A study on promotion strategies and incentive approaches of precast techniques for building construction in Taiwan
楊智斌
;
何明錦
[土木工程學系 ] 研究計畫
2021-12-21
工程時程網圖製作與審查準則建立暨審查自動化輔助系統建立之研究;A Study on Developing Schedule Development and Review Principles and Automatic Review System
楊智斌
[土木工程學系 ] 研究計畫
2021-12-21
科技人才需求與供給推估模式建構之前期研究;Preliminary Study on Developing Demand and Supply Forecasting Model for Technical Talents
楊智斌
[營建管理研究所 ] 研究計畫
2021-12-21
結合EVM/ESM/EDM方法之時程遲延分析技術之研究;Developing Schedule Delay Analysis Methods Based on Evm/Esm/Edm Approaches
楊智斌
[土木工程學系 ] 研究計畫
2023-07-17
工程時程網圖製作與審查準則建立暨審查自動化輔助系統建立之研究;A Study on Developing Schedule Development and Review Principles and Automatic Review System
楊智斌
[土木工程學系 ] 研究計畫
2023-07-17
智慧化建築工程時程規劃系統建立之研究;Smart Building Construction Schedule Development System
楊智斌
[營建管理研究所 ] 研究計畫
2011-08-01
考量工率折減之時程延遲分析方法之建立(III);Developing a Schedule Delay Analysis Method Considering Lost Productivity (Iii)
楊智斌
[營建管理研究所 ] 研究計畫
2012-09-01
考量浮時消耗之時程延遲分析方法之建立;Developing a Schedule Delay Analysis Method with Considering Float Consuming
楊智斌
[營建管理研究所 ] 研究計畫
2014-03-11
以浮時為基礎的時程延遲分析方法;Float-Based Schedule Delay Analysis Method
楊智斌
[營建管理研究所 ] 研究計畫
2012-12-01
考量浮時消耗之時程延遲分析方法之建立;Developing a Schedule Delay Analysis Method with Considering Float Consuming
楊智斌
[營建管理研究所 ] 研究計畫
2013-12-01
以浮時為基礎的時程延遲分析方法;Float-Based Schedule Delay Analysis Method
楊智斌
::: Copyright National Central University. | 國立中央大學圖書館版權所有 |
收藏本站
|
設為首頁
| 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
DSpace Software
Copyright © 2002-2004
MIT
&
Hewlett-Packard
/
Enhanced by
NTU Library IR team
Copyright ©
-
隱私權政策聲明