中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/10910
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41672206      線上人數 : 1411
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/10910


    題名: 多重專案規劃與控制:系統動態分析法暨流程建模技術的應用;Application of System Dynamics and Process Modeling Techniques for Planning and Controlling Multiple Projects
    作者: 陳弘翊;Hung-Yi Chen
    貢獻者: 工業管理研究所
    關鍵詞: 多重專案管理;系統動態;ARIS;Multi-Project Management;System Dynamics;ARIS
    日期: 2000-06-21
    上傳時間: 2009-09-22 14:09:42 (UTC+8)
    出版者: 國立中央大學圖書館
    摘要: 同步工程已經成為改善整體企業績效的有效方法之一,尤能縮短產品上市的時間。然而,同步工程亦即為基於時間形式的多重專案管理概念。當進行多重專案時,其複雜度是單一專案所無法比擬的。因此,傳統上我們所採用WBS, PERT, CPM等工具並無法有效的應用在多重專案的環境。本研究乃基於此動機而發展新的方法論謀求解決之道。 在資源有限的前提下,「資源作最有效率的分配」乃是最具挑戰性的管理課題。本篇研究所提出的多重專案之系統動態應用(SDMPM)包含兩大部分:系統動態(System Dynamics)與流程建模(Objected-Oriented Process Modeling),主要功能為協助企業管理階層進行資源管理,並提供整體性的多重專案管理解決方法。 SDMPM主用來解決兩大類問題:策略上與作業上的課題。首先,SD能將許多會影響專案績效的因子融入模式以考慮,並預測所需資源及進行資源有效分配。SD模擬之結果可協助高層管理者進行資源策略(政策)之研擬。其次,本研究將結合OOA及ARIS方法論,並擷取傳統工具的優點發展出OOPM。 Concurrent Engineering (CE) has become one of the most effective approach for business to improve overall business performance, especially in shorting “time to market”. As known, CE is an evolution of the time-based project management concept basically. Proceeding multi-project is much more complex than the domain of single project. When traditional project management techniques, such as work breakdown structure (WBS), Program Evaluation and Review Technique (PERT), and Critical Path Method (CPM), have been found lacking the effectiveness in planning and controlling individual CE project, the management of multiple CE projects becomes more difficult. Therefore, it is of interest to develop new methodology for multi-project management. “Resource allocation in the best way” is the most challenging managerial topic, while multiple projects compete for the limited resource. In this research, we will discuss the problems of resource management in multi-project environment and then propose a integrated solution called System Dynamics of Multi-project Management (SDMPM) to assist making managerial decision on allocating resources to multiple projects. The innovative framework developed is composed of System Dynamics (SD) and Object-Oriented Process Modeling (OOPM). SDMPM is developed for solving two levels of managerial problems, strategic and operational. First, SD incorporates the more subjective factors which can have an important influence on each project and will be used to estimate the amount of resource required and optimize resource allocation. The simulation results from SD will assist high-level manager to build up long-term resource management policies (e.g., human resource policy) and medium-term multi-project schedule. Second, we adopt the advantage of traditional network concepts and apply the powerful tools of process modeling such as OOA and ARIS, which also incorporates with knowledge management concept to construct OOPM for offering detailed operational schedule and implementation.
    顯示於類別:[工業管理研究所 ] 博碩士論文

    文件中的檔案:

    檔案 大小格式瀏覽次數


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明