中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/11036
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41655135      線上人數 : 2279
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/11036


    題名: 限制驅導式生產排程在PCBA製程的運用;An Application of Drum-Buffer-Rope Production Scheduling in PCBA process
    作者: 林晉福;Chin-Fu Lin
    貢獻者: 工業管理研究所碩士在職專班
    關鍵詞: 標準工時;限制理論;限制驅導式排程與管理;排程手法;Drum-Buffer-Rope(DBR);Scheduling;Standard working time;Theory of Constraints(TOC)
    日期: 2007-12-26
    上傳時間: 2009-09-22 14:12:33 (UTC+8)
    出版者: 國立中央大學圖書館
    摘要: 今日,全球企業的經營環境快速變化,產業間彼此的競爭非常激烈,除了不斷地加強產品研發創新的能力以及行銷策略的手法,更必須提高製程系統的能力。一個能提供高品質、低成本,以及交期準確的製程系統,往往會是企業競爭力的基本根源。 在製程系統中,現場排程往往扮演著關鍵性的角色。一個不良的排程系統將會影響產品的生產效率,造成在製品的堆積,和訂單交期的延誤。因此,本研究透過限制驅導式現場排程(Drum-Buffer-Rope, DBR)的手法,與個案工廠現況排程方法的實例演練做比較,尋求一個改善生產效率與控制排程的最佳手法。 而由本研究的實例演練中,可以從其結果得知以DBR的現場排程方式相較於個案工廠現況排程方法,可以更明白地指出製程系統的瓶頸所在,並且根據瓶頸給予適當的緩衝區間。以執行一個妥善的生產排程機制,來掌握現場的生產狀況,與交期預測和控制,以確保產品的如期產出,進而提升顧客滿意度,獲取更大量的訂單。 Nowadays, the environment of global business is changing rapidly. Due to the severe competition, companies not only have to strengthen their product innovation ability and marketing strategy, but also need to improve the manufacturing management. An effective production scheduling system will improve the quality, lower the cost and assure the delivery time. Hence, production scheduling is one of the fundamental factors in commercial competition. In manufacturing management, on-site scheduling plays a crucial role. An inefficient scheduling system can affect the production efficiency, sequence and eventually cause excess inventory or shipping delay. This research sought solutions to improve production efficiency and scheduling by comparing the Drum-Buffer-Rope (DBR) methodology with the case study practiced in a factory. After the field practical experiment, the bottleneck of production could be easily identified by using on-site planning of DBR, in contrast to the existing scheduling method in the factory. Therefore, buffer zones could be properly arranged according to the bottleneck. As a result, by operating an efficient manufacture schedule to control the production line, predicate the lead-time and avoid delay will consequently increase the customer satisfaction and bring more orders to the company.
    顯示於類別:[工業管理研究所碩士在職專班 ] 博碩士論文

    文件中的檔案:

    檔案 大小格式瀏覽次數


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明