中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/11273
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 78852/78852 (100%)
造訪人次 : 38000695      線上人數 : 827
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/11273


    題名: 具機器可用時間與機器合適度限制且工作具互斥性之平行機台排程問題;Parallel Machine Scheduling with Machine Availability, Eligibility and Job Incompatible Constraint
    作者: 賴以翔;Yi-hsiang Lai
    貢獻者: 工業管理研究所
    關鍵詞: 服務水準限制;工作互斥;合適度限制;可用時間限制;平行機台;網路流;分枝界限法;排程;machine availability;parallel machine;network flow technique;branch and bound algorithm;incompatible jobs;Scheduling;service level;machine eligibility
    日期: 2007-07-10
    上傳時間: 2009-09-22 14:17:54 (UTC+8)
    出版者: 國立中央大學圖書館
    摘要: 在此研究中,我們考慮當極小化最大延遲時間時,在具機器可用時間與機器合適度且工作具互斥性限制下,n個不可分割的工作和m台平行機台的排程問題。每台機器只有某些時間區段可以被安排處理工作,每個工作也只能被安排在某些特定的機器上,每個工作和機器上的每個可用的時間區段都有特定的服務水準,而只有當這個時間區段的服務水準高於或等於工作的服務水準時,此工作才能被安排在這個時間區段內,某些工作會屬於某個群組,且只有工作屬於不同群組能被放置於同一可用的時間區段中進行工作。 我們提出一個分枝界限演算法去尋找這個問題的最佳解。首先,我們提出一演算法基於最多剩餘工作之群組優先/最早截止時間優先(MJF/EDD)法則來得到上限。然後,我們網路流技術用來闡述可分割工作的排程問題並將其轉變成最大流量問題。我們提出一個由林正峰(2006)延伸而來的演算法,其結合網路流技術和二元搜尋法去找到該問題的最佳解,並將其結果作為我們的下限。最後,我們提出四個支配的法則來提升分枝界限法的效率。 實驗的分析顯示,所提出的淘汰法則是有效率的並且在分枝界限法中只有非常小的比例的節點被產生。在所有淘汰法則中,我們發現利用工作互斥限制式刪除的節點比例會隨著有群組的工作比例上升或群組的數目減少而增加。我們的演算法能用於15個工作、7台機器和3個群組問題下而得到一個最佳解。 In this paper we consider the problem of scheduling n non-preemptive jobs on m identical machines with machine availability, eligibility and incompatible job constraints when minimizing the maximum lateness. Each machine is not continuously available at all time and each job is only allowed to be processed on specific machines. Each job has to be processed at an availability interval with the same service level or higher. Some job belongs to a family and only jobs from different family may be processed in the same availability interval. We propose a branch and bound algorithm to find out the optimal solution. Firstly, we propose an algorithm which bases on the Most Remaining Jobs Family First/Earliest Due Date First (MJF/EDD) rule to find an upper bound. Then, we use a network flow technique to model the scheduling problem with the job preemption into a series of maximum flow problems. We propose an algorithm which extends from the work of Lin (2006). Our algorithm combines a network flow technique and a binary search procedure to find an optimal solution for the scheduling problem with the job preemption and use the result as the lower bound. Finally, we use four dominance rules to increase the efficiency of the branch and bound algorithm. Computational analysis shows that eliminating rules proposed is effective and very low percentage of nodes is generated by the branch and bound algorithm. Among those eliminating rules, we find the percentage of nodes eliminated by job incompatible restriction increases as the probability in generating jobs with a family type increases or number of families decreases. Our algorithm can get the optimal solution for the problem with up to 15 jobs, 7 machines and 3 families.
    顯示於類別:[工業管理研究所 ] 博碩士論文

    文件中的檔案:

    檔案 大小格式瀏覽次數


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明