中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/3018
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41749371      Online Users : 1996
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/3018


    Title: 公共工程進度計算方式之認定研究;A Study toward Identify Scheduling Approaches for Public Construction Works
    Authors: 劉智遠;Chih-Yuan Liu
    Contributors: 營建管理研究所
    Keywords: 進度認定;履約遲延爭議;進度計算方法;scheduling approach;public construction works;scheduling recognition
    Date: 2005-06-03
    Issue Date: 2009-09-21 12:03:25 (UTC+8)
    Publisher: 國立中央大學圖書館
    Abstract: 政府採購法第一百零一條訂定廠商有違法或重大違約情形時,經異議及申訴之處理程序後,視其結果刊登於政府採購公報,並禁止其一定期限內不得參加投標、作為決標對象或分包廠商等選擇締結契約對象,以杜不良廠商之違法、違約行為,避免其再危害其他機關,建立廠商間之良性競爭環境。該法條第一項第十款及其施行細則針對「延誤履約期限,情節重大者」條文予以定義,明確定義承包商得依循監造人員依法行政之履約進度標準。 若承包商發生可歸責於己事由,未能依照預定之工程進度施工而遲延,則甲方除可依政府採購法懲處外,另依工程契約及民法之規定,亦可對廠商追究責任。可見進度之計算方法對承包商權益影響深遠,然而目前卻無明確規範。因此,本研究擬針對此問題深入探討。 本研究蒐集常見之進度計算方法,予以分類與討論其優缺點,並提出適用工程特性之方法,再兼論履約遲延爭議之實質損害與影響,以建議公共工程採購具備合理基礎之進度計算方法,解決採購機關空有進度標準卻無認定進度計算法則,而存在之爭議與矛盾,避免監造人員陷於嚴酷執行契約或放水之兩難,並可引導承包商循進度計算方法執行進度控管。 A contractor that fatally breaks regulations or contracts according to the article 101st of the Government Procurement Law is forced to prohibit from awarding public construction works in the future. This is to compel inferior contactors in order to protect government bureaus and quality of infrastructure; in the meantime, identification of the agreed calculation method of scheduling in a contract is one of the most causes triggering if the contract or regulations are broken. In practice, it is also ambiguous to select a suitable scheduling approach for both parties in a construction project. The objective of this research is to build up a referable chart that lists suitable scheduling approaches for each category of public construction projects by literature review and case investigation. Analyzing intensely in all collected cases caused by differential recognition of both parties drove to the core of the study. By using the referable chart, conflicts and damages to both parties in a public construction project are expected to moderate.
    Appears in Collections:[Graduate Institute of construction engineering] Electronic Thesis & Dissertation

    Files in This Item:

    File SizeFormat


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明