English  |  正體中文  |  简体中文  |  Items with full text/Total items : 65317/65317 (100%)
Visitors : 21294794      Online Users : 360
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    研究計畫 [120/120]
    期刊論文 [23/23]
    考古題 [42/42]

    Collection Statistics

    近3年內發表的文件: 46(18.04%)
    含全文筆數: 255(100.00%)

    文件下載次數統計
    下載大於0次: 255(100.00%)
    下載大於100次: 237(92.94%)
    檔案下載總次數: 164290(70.42%)

    最後更新時間: 2019-05-22 05:19


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 1-25 of 255. (11 Page(s) Totally)
    1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2019-01-25 我國重大公共工程停工解約原因分析與預防措施之研擬;Causes and Responses of Contract Suspension and Termination for Large and Important Construction Projects 張宸样; Chang, Chen-Yang
    2019-01-25 運用巨量資料與系統模擬建構預鑄產業人力彈性運用之決策評估模型;Integrating precast big data and system simulation to improve manpower allocation for construction precast production 鄭鈞耀; Cheng, Jiun-Yao
    2019-01-21 可行性研究報告質量管理研究 - 以越南湄公河三角洲為例;A research on quality management of feasibility study reports - A case study of Mekong Rive Delta, Vietnam 張河世剛; Cuong, Truong Ha The
    2019-01-21 公部門組織導入BIM推動策略與決策評估模式之研究;A Study on Developing BIM Implementation Strategies and Decision Evaluation Model for Public Sector Organizations 周宏宇; Chou, Hung-Yu
    2018-08-22 營建工程S進度曲線(S-curve)建立方式與審查原則之研究;Development Principles and Review Criteria of S-curve for Construction Projects 劉心慧; Liu, Hsin-Hui
    2018-08-21 天然災害後橋梁特別檢測及修復優選排序模式之研究;A Model for Prioritizing Bridges for Damage Inspection and Rehabilitation after Natural Disasters 張榮安; Jallow, Mustapha
    2018-08-20 公共工程因工期展延增加監造服務費相關問題之研究;A Study of Problems Related to Supervision Fee Increase in Public Works due to Extension of Construction Duration 洪鈺芝; Hong, Yu-Chih
    2018-08-20 政府委託民間機構實施大型都市更新案例之研究;A Study on Large-Scale Urban Renewal Project Performed by Private Sector 黃瑄博; Huang, Hsuan-Po
    2018-08-17 橋梁管理資訊系統智慧型資料偵錯工具之建立;Establishment of Error Data Detection Mechanisms for Bridge Management System 張欣旻; Jhang, Sin-Min
    2018-08-06 建築工程不同階段施工合理工期推估模式之研究;Estimation approaches of reasonable construction duration in different stages of building projects 范姜逸珊; Chiang, Stella Fan
    2018-07-31 結合建築資訊模型與知識本體建模技術 輔助消防安全設備審查之研究;Building Information Modeling and Ontology Facilitated Fire Safety Equipment Review 彭俞翔; Peng, Yu-Hsiang
    2018-07-31 營造業工程人員決策與安全行為關聯性之探討 林佳蓁; LIN, CHIA-CHEN
    2018-07-30 以社會大眾需求角度探討智慧城市發展策略之研究;Development strategies for smart city based in civilian′s demands 蘇郁晴; Su, Yu-Ching
    2018-07-30 應用本體論輔助營建工程品質特性要因分析之研究;An Ontology-based Approach to Support Cause and Effect Analysis for Construction Industry 王冠晴; Wang, Kuan-Ching
    2018-07-18 採用層級分析法探討機關辦理聯合開發之影響因子 -以桃園市捷運綠線為例;Exploring impact factors of MRT joint development using AHP: Case study of Taoyuan MRT green line 吳易勳; Wu, Yi-Shiun
    2018-07-12 機關實施統包之決策評估模式;Decision-Making Model of Implementing Turnkey Construction in Public Works 吳盈瑩; Wu, Ying-Ying
    2018-06-19 利用平衡計分卡及模糊層級分析法探討材料供應商 評選因素之研究-以結構補強統包工程為例;Material Supplier Selection Modelling by BSC and FAHP - the Example of Structural Retrofit Turnkey Contractors 張家豪; Chang, Chia-Hao
    2018-06-14 臺灣建築師事務所管理模式與員工滿意度對組織承諾影響之研究 葉宗弦; Yeh, Chung-Hsuan
    2018-01-29 4D 技術在營建產業應用領域之文獻分析;Analysis of Application Areas of 4D in Construction Industry: Literature Review 馬莫德; Manneh, Mamud
    2018-01-29 以 2005-2016 年間文獻分析成效式契約之關鍵成功因素;Identifying Critical Success Factors Based on the literature of Performance-Based Contracts between 2005 and 2016 阮文小正; Chinh, Nguyen Van Be
    2018-01-26 運用總體經濟與環境特徵概念之地價估價模式實證研究: 以印尼衛星都市為例;A PRELIMINARY EMPIRICAL LAND PRICE MODELLING USING ENVIRONMENTAL FEATURES: A CASE STUDY FOR A SATELLITE CITY IN INDONESIA 維蒂亞; Azzizi, Vidya Trisandini
    2018-01-26 營建工程於設計階段實施施工安全風險評估現況與推動誘因之研析;Studying the Current Status and Incentives of Implementing Construction Safety Risk Assessment in The Design Stage 郭建亨; Kuo, Chien-Heng
    2018-01-25 越南湄公河三角洲營造安全績效評估之研究;EVALUATING CONSTRUCTION SAFETY PERFORMANCE OF MEKONG DELTA IN VIETNAM 譚惇桓; Dam, Duong Huynh
    2018-01-24 虛擬實境應用於營建勞工安全教學成效之研析;Safety training performance in construction using virtual reality applications 洪新淯; Hung, Sin-Yu
    2018-01-10 應用BIM技術時RFI價值之調查研究;A Survey on Request For Information Values in Building Information Modeling Implementation 蕃英宝; Bao, Phan Anh

    Showing items 1-25 of 255. (11 Page(s) Totally)
    1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback  - 隱私權政策聲明