摘要: | 工程之規劃設計品質影響生命週期整體之成效,公共工程現行實施之品管制度,於施工階段之品質管理有施工品質查核、施工三級品管等機制。規劃設計作業對工程後續營運、維護影響重大與深遠,因此規劃設計階段應有較完整之流程,可獲得較佳之方案,且可避免規劃設計之不當。 本研究收集相關國內外文獻及現況資料分析,針對國內公部門工程機關績效評估制度、公共工程金質獎、近年來相關研究案,以及論文及國外績效評估方法與文獻等,配合政府近年來落實永續公共工程目標,對相關績效評估制度進行探討與彙整。經由問卷的方式,配合永續公共工程-節能減碳策略白皮書、相關法令規章、生態工程、工程全生命週期品質管理的觀念,經由專家訪談,嘗試建立規劃設計階段技術服務廠商評選指標。應用AHP層級分析法訂定權重,再配合德爾菲法專家訪談,以決定評選指標項目,共計23項。最後選取四個公共工程,進行試評比較分析加以驗證,其評估之結果均與廠商實際執行狀況相符,可驗證本研究成果之正確性。 本研究所建立之評選指標,可以評核規劃設計階段技術副廠商之服務品質,並落實永續公共工程指標,減少施工階段衍生不必要之變更設計及工程爭議,進而在品質、進度、成本兼顧情形下,順利完成公共工程之建設。 The quality of the Construction Planning and Designing affects the effectiveness of the complete life cycle, the currently implemented quality control system of public works and engineering, the quality management during the construction phase is under the inspection of Construction Quality Management and Construction three-level Quality Management mechanism. The work of Planning and Designing has significant influence and profound impact on the follow-up operation and maintenance of the Construction, thus, a complete procedure must be present in the planning and designing phase. This will not only provide a better proposal, but also avoid irrelevant planning and designing of the construction. This study collected relevant literature review from both domestic and international papers as well as the current data analysis, The discussion and compilation of the study of the related performance evaluation system was conducted in accordance with the performance evaluation system of the domestic public sector construction agency, public works and engineering golden triad award, recent relevant researches, as well as thesis and international performance evaluation methods and reference documents, and work in co-operation with the recent practice of sustainable public works target set by the government. With the help of questionnaire, cooperation with sustainable public works - carbon reduction strategy white paper, relevant laws and regulations, ecological engineering, the concept of the complete life cycle of quality management, and through interview with professionals, attempt to establish an evaluation index of technical service planning and designing phase. The weight was set by applying the AHP level analysis method, and together with the Delphi expert interviews, the items of evaluation index were determined, a total of 23 items. Finally, four public works were selected to make a trial evaluation comparative analysis to verify, the evaluation results are consistent with the firm’s actual execution, thus verifying the accuracy of this study’s result. The evaluation index established in this study can evaluate the service quality of the planning and designing phase of technical service, and at the same time, can implement sustainable public work index, reduce unnecessary change in design and disputes during the construction phase, and moreover, with consideration of quality, progress and cost, successfully complete the construction of public works. |