中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/44599
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 78852/78852 (100%)
Visitors : 37838167      Online Users : 490
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/44599


    Title: 以設計結構矩陣為基底之流程與分工結構圖整合機制;A DSM-based Approach to Integrating Process with WBS
    Authors: 鄧煥友;Whan-Yo Deng
    Contributors: 資訊工程研究所
    Keywords: 流程管理;專案管理;設計結構矩陣;專案規劃;Project Planning;Process Management;and Design Structure Matrix;Project Management
    Date: 2010-07-12
    Issue Date: 2010-12-09 13:50:11 (UTC+8)
    Publisher: 國立中央大學
    Abstract: 在軟體開發的專案中,分工結構圖可以用來定義專案的範圍、預估專案成本與時程、協助專案監控,然而要制定一個完整專案的分工結構圖並不是一件簡單的事情,尤其分工結構圖的制定必須符合組織內部的標準流程,以組織內部標準流程為基準發展專案計劃提供較穩定的流程效能,否則容易發生專案預估超時或過短的情況進而導致專案失敗。設計結構矩陣的技術目前已廣泛應用在專案開發的系統分析上,應用範圍包含系統架構模組分析、人員規劃、專案流程規劃等,本研究希望能透過設計結構矩陣整合流程與分工結構圖,並協助專案經理人於以下兩點: 1. 流程轉分工結構圖:制訂分工結構圖時能主動參考組織內部的標準流程,以增加專案時程規劃的準確性。 2. 分工結構圖轉流程:將分工結構圖轉換成可執行工作流程定義語言,並利用工作流程引擎進行專案流程控管以增加專案執行的效率。In software development, project plans document scope, cost, effort, and schedule, guide project managers, and control project execution. Developing a project plan without incorporating how an organization doing things -- i.e., organizational culture -- may lead to project failure. To ensure stable process performance and to benefit from organizational culture, it is crucial that organizational processes be taken into account in project planning. Organizational processes enable stable process performance across an organization and provide a basis for cumulative, long-term benefits to the organization. In proposing a systematic approach that supports bi-directional transformation between processes and the work breakdown structure (WBS), we propose Process2WBS and WBS2Process to assist project managers in project planning with an organization's set of standard processes. Process2WBS consumes processes and transforms them into a WBS with design structure matrix (DSM) analysis, and WBS2Process transforms the WBS with project-specific information into executable processes expressed in XPDL.
    Appears in Collections:[Graduate Institute of Computer Science and Information Engineering] Electronic Thesis & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML778View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明