English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41662297      線上人數 : 2039
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/46297


    題名: 雪山隧道路徑導引策略研究;A Study on Route Guidance Strategies of Hsuehshan Tunnel
    作者: 陳建銘;Jian-Ming Chen
    貢獻者: 土木工程研究所
    關鍵詞: 交通壅塞;路徑導引策略;績效評估;Route Guidance Strategies;Performance Evaluation;Traffic Congestion
    日期: 2011-01-20
    上傳時間: 2011-06-04 14:54:40 (UTC+8)
    摘要: 近年來政府大力推動公路路網建設以平衡城鄉間的發展,如已完工通車的國道5號(蔣渭水高速公路)與北二高均有不少的隧道工程,其中雪山隧道就屬國內最著名的長隧道工程。雪山隧道平常日皆能紓解現有車流,但每適逢春節連續假期、國定假日、例假日往往出現塞車情形。當交通需求持續增加至超過隧道容量時,隧道發生交通壅塞因半封閉特性易造成交通疏散與廢氣排除不易,而引發相當嚴重的交通惡化結果,甚至釀成嚴重事故。 本研究對雪山隧道進行車流特性分析,並以旅行時間為控制依據,研擬不同路徑導引策略,透過策略中各個方案績效值之評定,以提供管理者作為決策參考。本研究以旅行時間最短為控制目標,研擬旅行時間、延遲導引與持續導引策略,並以導引時間、平均旅行時間、等候持續時間與平均延滯作為績效評估項目,評估其策略之效益。 研究結果顯示,延遲導引時間越長,開始導引的時間越晚,總導引次數隨之減少,而平均旅行時間與平均延滯隨之增加。 In recent years the government vigorously impelled the road road network construction by to balance the development between the city and countryside. The tunnel projects can be found in National Expressway No.5, Jiang Weishui Highway and Northern National Highway No.2. In all of the tunnel projects, Hsuehshan Tunnel is the most famous long tunnel. The Hsuehshan Tunnel ordinary day all can relieve the existing traffic, but just happens to meet the Spring Festival, the nationally established holiday, the legal holiday date often has the traffic congestion. When the traffic demand increases continually to surpasses capacity of the tunnel, because the tunnel has the transportation clogged up half seal characteristic easy to create the transportation to disperse with the waste gas removes not easily, but initiates the quite serious transportation worsening result, even breeds the serious accident. This research mainly focuses on the traffic flow in Hsuehshan Tunnel and has an analysis on it. Travel time is controlling criteria, and to discuss different route guidance strategies. The thesis is expected to provide the managers suggestions through various performance evaluations. The shortest travel time is controlling target and to design the strategies including travel time, delayed guidance and continued guidance. The strategies are evaluated by duration of route-guidance, average travel time, time in queue and average delay. The research shows that time of delayed guidance increasing, beginning time of guidance is more later, times of total guidance decreasing, thus average travel time and average delay all increasing.
    顯示於類別:[土木工程研究所] 博碩士論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML810檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明