中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/60397
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41652520      Online Users : 1696
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/60397


    Title: 公路橋梁檢測最佳化模式分析
    Authors: 姜蔚宗;Jiang,Wei-tsung
    Contributors: 土木工程學系在職專班
    Keywords: 公路橋梁檢測;最佳化模式;資源派遣;Lingo運算軟體;highway bridge inspection;schedule adjustment;optimal model;Lingo software
    Date: 2013-07-22
    Issue Date: 2013-08-22 11:36:13 (UTC+8)
    Publisher: 國立中央大學
    Abstract: 截至目前(101年)台灣公路已累計5,143公里,其中公路橋梁2,989座占了524公里達到了整體公路系統的10.2%,日漸完善的公路系統逐漸朝向養護管理的方向,交通部運輸研究所於100年10月研擬了「橋梁目視檢測評估手冊(草案)」說明了橋梁檢測的標準流程及作業方法,採用的檢測方式為目視檢測搭配DER&U評估法其檢測相當耗時費工,橋梁檢測中包含了橋梁的檢測時間、交通的旅行時間、車輛及人員差異等因素,依據目前公路橋梁檢測作業機制發展一套規劃模式將工務段的資源進行最佳化指派,並配合Lingo運算軟體於合理之時間內求解最佳化排程係為本研究之主要核心,將目前作業排程與本研究成果相互比較,所得之結論確實可以有效提升效率,並可配合現況資源異動重新調整限制,立即重新規劃排程有效靈活運用於現況作業機制,有此可知本研究成果確實可提供較快速且有效的資源派遣決策,最後將相關之結論與建議提供參考。
    Thus far, the Taiwan highway network has reached 5,143 km in length. The total length of all 2,989 highway bridges is about 524 km, 10.2% of the total highway length. The management system for the highway network has become better and better and stepped to maintenance type. In October, 2011, the Institute of Transportation, MOTC published “A Study on Drafting the Bridge Visual Inspection and Evaluation Manual”, detailing the SOP and methodology of bridge inspection. Normally, Taiwan’s bridge inspection is combined with visual checking and DER&U methods. This inspection method takes a long time and requires huge amounts of human resources because it includes so many basic items such as the duration of inspection, travel time, differences in vehicle velocity and so on.
    This thesis develops a mathematical model calculated by the Lingo software for optimization of bridge inspection within a reasonable period of time under the current rules. Comparison of the results of current methodologies and this new strategy shows that the new methodology can enhance the efficiency and immediately readjust the schedules with changing conditions. Furthermore, results can be obtained faster and more effectively make resource arranging strategies.
    Appears in Collections:[Executive Master of Civil Engineering] Electronic Thesis & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML766View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明