中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/66076
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 42142952      Online Users : 1353
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/66076


    Title: 應用建築資訊模型輔助橋梁目視檢測之研究;Application of building information model (BIM) for assisting bridge inspection
    Authors: 周昱棋;Chou,Yu-chi
    Contributors: 營建管理研究所
    Keywords: 建築資訊模型;橋梁目視檢測;物件導向;關聯式資料庫
    Date: 2014-08-26
    Issue Date: 2014-10-15 17:28:30 (UTC+8)
    Publisher: 國立中央大學
    Abstract: 目前台灣地區的橋梁普遍以目視檢測作為橋梁維護管理之第一步驟,因此目視檢測本身的資料正確性及完整度將直接影響橋梁後續各項維護管理工作之進行。建築資訊模型是一個以構件為基礎之資料模型,具備儲存設施全生命週期資料、物件導向、參數化及3D以上視覺模型等特性,而這些特性恰可應用於輔助橋梁目視檢測的作業上。本研究之目的在於建立一個以構件為基礎之資料模型,從目視檢測的工作流程開始,分析流程內的各工作項目並探討其所需及產出之資料,再根據資料之性質做分類,以此建立一個以構件為基礎之資料模型。資料模型建立完畢後,將於研究的最後回歸目視檢測之作業流程,探討本研究所提之資料模型在目視檢測流程各階段中所帶來之可能應用。;Building Information Model (BIM) has been introduced recently and gradually used in both engineering-related studies and practical cases. This study purpose is to apply BIM to bridge inspection using object-oriented and multi-dimension techniques. Taking data samples from the current databank of the Taiwan Bridge Management System (TBMS), we were able to locate items, which require manual inspections. The customer-oriented BIM could be built including bridge basic information, historical inspection records, and deterioration data. The study also provided the concepts of how the customer-oriented database design layout is and what the association rules between items are. The implementation demonstrated how a real deterioration is displayed on the interface of BIM and the convenience that current manual inspection can reach. The study suggests that bridge maintenance should consider all phases to reach the optimal benefits by the proposed model. An enhanced model based on the lifecycle management aspect should be beneficial to practitioners.
    Appears in Collections:[Graduate Institute of construction engineering] Electronic Thesis & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML585View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明