中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/76998
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 78937/78937 (100%)
Visitors : 39805024      Online Users : 593
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/76998


    Title: 批量機台具合適度限制及等候時間限制求最小化總完工時間之生產排程問題;The Parallel Batch Machine Scheduling with Machine Eligibility and Waiting Time Constraints to Minimize Total Completion Time
    Authors: 黃逸華;Huang, Yi-Hua
    Contributors: 工業管理研究所
    Keywords: 總完工時間;平行機台;批量加工;等候時間限制;Parallel machine;batching processing;waiting time constraints;total completion time
    Date: 2018-08-22
    Issue Date: 2018-08-31 12:43:53 (UTC+8)
    Publisher: 國立中央大學
    Abstract: 在本研究中,我們研究 n 個可以進行批次加工的工作跟 m 台平行機台的排程問題,這些平行機台的處理時間是不同的,針對不同機台的合適度條件,即是說工作有適合自己加工的機台,在符合的機台環境下,該工作才能加工,另外工作可以集合成批次再進到機台內開始進行加工,我們研究的目標是在找最小化的總完工時間。
    為了求出這個問題的最佳解,本研究提出了一個分枝定界的演算法,在本研究的演算法中首先針對每個工作抵達機台的時間作排列,將率先抵達的工作針對每個機台的可用批次位置做分枝,決定工作在合適機台的批次上加工,接著在考慮剩餘的工作進入相同或不同批次時,該如何作規劃。
    ;In this research, we research the scheduling problem with n jobs that can be divided into batches and m parallel machines under availability constraint. Due to the eligibility constraint, each jobs has its own recipe, not all m machines can process job’s recipe. And the jobs have the waiting time before the processing, they can process together when their arrival time smaller than the batch’s waiting time. The objective of our scheduling problem is to minimize the total completion time.
    In order to find the best solution to this problem, this research proposes a branch and bound algorithm. In the algorithm of this study, first, we resort a sequence according to the job ‘s arrival time. The available batch positions of the machines are branched, and we determine whether schedule the job to process on the batch of the machine, and then how to plan the remaining job entering the same or different batches.
    Appears in Collections:[Graduate Institute of Industrial Management] Electronic Thesis & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML338View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明