English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 78937/78937 (100%)
造訪人次 : 39829834      線上人數 : 1724
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/81777


    題名: PPP專案移轉階段技術性能風險控管之研究—以大陸高速公路為例;Research on Technical Performance Risk Control in the PPP Project Transfer Phase—Taking the Mainland Expressway as an Example
    作者: 張弛承;CHICHENG, ZHANG
    貢獻者: 營建管理研究所
    關鍵詞: 移轉階段;技術性能;風險管理;大陸高速公路;transfer phase;technical performance;risk management;Mainland Expressway 
    日期: 2019-07-02
    上傳時間: 2019-09-03 17:01:25 (UTC+8)
    出版者: 國立中央大學
    摘要: PPP(Public-Private Partnership)建設模式在移轉過程潛藏各式各樣的風險,然而技術性能風險卻因為案例較少、缺乏實際經驗,成為實務關注的盲點。如果PPP模式之高速公路建設,在營運期屆至廠商將要移轉公路所有權予政府時,而政府對路面品質又無法嚴格監控,則移轉前,廠商可能為了降低成本,而忽略安排大中修,轉而採行塗脂抹粉修飾之簡單養護,最終將造成用路人之重大權益損害;更將大幅調工公路之總生命成本,而造成钜額政府預算負擔。本研究擬以大陸浙江省高速公路為例,就技術性能風險展開深入研究,尋找客觀的檢測標準用於道路性能評估,以建構PPP建設專案移轉階段之技術性能管理指南,供政府操作參考。;The PPP (Public-Private Partnership)construction model has a variety of risks hidden in the transfer process. However, the technical performance risk is a blind spot of practical attention because of fewer cases and lack of practical experience.

    If the PPP mode of highway construction, when the operation period until the manufacturer will transfer the road ownership to the government, and the government can not strictly monitor the quality of the road, actually before the transfer, the manufacturer may ignore the arrangement of large and medium repairs in order to reduce costs.

    The simple maintenance of the application of the smear-coated powder will eventually result in the damage of the major rights and interests of the passers-by; the total life cost of the road will be greatly adjusted, and the government budget burden will be borne by the government.

    This study intends to take the highways in Zhejiang Province as an example to conduct in-depth research on technical performance risks, and to find objective testing standards for road performance evaluation, in order to construct a technical performance management guide for the PPP construction project transfer phase for government operation reference.
    顯示於類別:[營建管理研究所 ] 博碩士論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML176檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明