中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/93668
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 80990/80990 (100%)
Visitors : 41645793      Online Users : 1494
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/93668


    Title: 由設計監造視角之承商能力滿意度分析-以桃園國際機場第三航站區為例
    Authors: 許凱傑;Hsu, Kai-Chieh
    Contributors: 土木系營建管理碩士在職專班
    Keywords: 第三航站區;設計監造;承攬廠商;滿意度調查;The third terminal area;design supervision;contractor;satisfaction survey
    Date: 2023-07-11
    Issue Date: 2024-09-19 17:25:59 (UTC+8)
    Publisher: 國立中央大學
    Abstract: 隨著時代的進步、工程倫理的普及及工程技術的與時俱進,承攬廠商整體能力及競爭力亦應隨之成長,惟現今承攬廠商是否真的比以往進步,仍是相當重要的議題。因此本研究旨在探討設計監造單位對臺灣桃園國際機場第三航站區建設計畫(包含西側污水處理廠新建工程等10項工程)的承攬廠商滿意度。本研究採用便利性取樣,共計回收101份有效問卷,經分析結果顯示:(1)設計監造的實務經驗和工程主要工項與承攬廠商各項能力的滿意度皆未達顯著差異水準;(2)承攬廠商各項能力的滿意度間均存有顯著正相關;(3) 管理進度、管理品質及對契約文件熟悉度為承攬廠商應優先改善的項目。最後本研究將依據研究結果與結論,提出未來研究建議,以與桃園機場相關單位以及未來研究學者作為參考。;With the progress of time, the popularization of engineering ethics and the advancement of engineering technology, the overall capabilities and competitiveness of construction contractors should also grow accordingly. However, whether today′s contractors are really more advanced than before remains to be a question, especially with respect to major construction projects.
    Therefore, this study aims to explore the satisfaction of the design and construction units with the construction projects of the third terminal area of Taiwan Taoyuan International Airport (including 10 new projects such as the new sewage treatment plant on the west side establishment). In this study, convenience sampling was adopted, and a total of 101 valid questionnaires were obtained. The analysis results show that: (1) the practical experience of design supervision and the satisfaction degree of the main project items of the project and the contractor′s various capabilities do not reach the level of significant difference; (2) there is a significant positive correlation between the satisfaction of contractors′ various capabilities; (3) management progress, management quality, and familiarity with contract documents are key items that contractors should give priority for improvement. Finally, this study puts forward future research suggestions based on the research results and conclusions, and uses relevant units of Taoyuan Airport and future research scholars as a reference.
    Appears in Collections:[Executive Master of Construction Engineering and Management] Electronic Thesis & Dissertation

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML19View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明