參考文獻 |
中文部分
1. 阮昱瑋(2019)。TFT-LCD廠之Array製程區的RGV派送控制研究。國立中央大學工業管理研究所碩士未發表之論文,桃園縣。
2. 紀碧如(2006)。基因演算法用於增加產能的研究-以TFT-LCD廠Array製程RGV搬送為例。國立交通大學電機資訊學院碩士在職專班碩士論文,新竹市。 取自https://hdl.handle.net/11296/w22y3z
3. 張軒銘(2018)。TFT-LCD廠之自動化搬運系統的多屬性派送控制方法。國立中央大學工業管理研究所碩士論文,桃園縣。 取自https://hdl.handle.net/11296/7t7j5v
4. 楊景如, 沙永傑, & 洪瑞雲(2008)。晶圓廠自動化物料搬運系統之搬運策略模擬研究 (Doctoral dissertation).
5. 劉顥程(2012)。製造系統之無人搬運車的控制問題研究。國立中央大學工業管理研究所碩士論文,桃園縣。 取自https://hdl.handle.net/11296/56cme9
英文部分
1. Atmaca, E., & Ozturk, A. (2013). Defining order picking policy: A storage assignment model and a simulated annealing solution in AS/RS systems. Applied Mathematical Modelling, 37(7), 5069-5079.
2. Ávila, T., Corberán, Á., Plana, I., & Sanchis, J. M. (2015). The stacker crane problem and the directed general routing problem. Networks, 65(1), 43-55.
3. Azimi, P., Haleh, H., & Alidoost, M. (2010). The selection of the best control rule for a multiple-load AGV system using simulation and fuzzy MADM in a flexible manufacturing system. Modelling and Simulation in Engineering, 2010, 7.
4. Bozer, Y. A., & Eamrungroj, C. (2018). Throughput analysis of multi-device trip-based material handling systems operating under the modified-FCFS dispatching rule. International Journal of Production Research, 56(4), 1486-1503.
5. Bozer, Y. A., & Yen, C. K. (1996). Intelligent dispatching rules for trip-based material handling systems. Journal of Manufacturing Systems, 15(4), 226-239.
6. Brezovnik, S., Gotlih, J., Balič, J., Gotlih, K., & Brezočnik, M. (2015). Optimization of an automated storage and retrieval systems by swarm intelligence. Procedia Engineering, 100, 1309-1318.
7. Chang, D. S., & Te Lai, S. (2015). Implementation of cross-generation automation transportation system in the TFT-LCD industry. The International Journal of Advanced Manufacturing Technology, 78(5-8), 753-763.
8. Cho, H. M., & Jeong, I. J. (2017). A two-level method of production planning and scheduling for bi-objective reentrant hybrid flow shops. Computers & Industrial Engineering, 106, 174-181.
9. Confessore, G., Fabiano, M., & Liotta, G. (2013). A network flow based heuristic approach for optimising AGV movements. Journal of Intelligent Manufacturing, 24(2), 405-419.
10. Cong, P. A. N., Zhang, J., & Wei, Q. I. N. (2017). Real-time OHT Dispatching Mechanism for the Interbay Automated Material Handling System with Shortcuts and Bypasses. Chinese Journal of Mechanical Engineering, 30(3), 663-675.
11. Egbelu, P. J., & Tanchoco, J. M. (1984). Characterization of automatic guided vehicle dispatching rules. The International Journal of Production Research, 22(3), 359-374.
12. Gola, A., & Kłosowski, G. (2019). Development of computer-controlled material handling model by means of fuzzy logic and genetic algorithms. Neurocomputing.
13. Ho, Y. C., & Liu, H. C. (2006). A simulation study on the performance of pickup-dispatching rules for multiple-load AGVs. Computers & industrial engineering, 51(3), 445-463.
14. Ho, Y. C., Lin, J. W., Liu, H. C., & Yih, Y. (2016). A study on the lot production management in a thin-film-transistor liquid-crystal display fab. Journal of Manufacturing Systems, 40, 9-25.
15. Hu, W., & Mao, J. (2012, December). Online dispatching of rail-guided vehicles in an automated air cargo terminal. In 2012 IEEE International Conference on Industrial Engineering and Engineering Management (pp. 1344-1348). IEEE.
16. Hu, W., Mao, J., & Wei, K. (2013, August). Energy-efficient dispatching solution in an automated air cargo terminal. In 2013 IEEE International Conference on Automation Science and Engineering (CASE) (pp. 144-149). IEEE.
17. Huang, Y. S., & Chen, H. W. (2018). A mixed dispatching rule for semiconductor wafer fabrication. International Journal of Systems Science: Operations & Logistics, 5(3), 195-203.
18. Hwang, S., Hong, S. P., & Jang, Y. J. (2018, August). Dynamic scheduling of the dual stocker system using reinforcement learning. In IFIP International Conference on Advances in Production Management Systems (pp. 482-489). Springer, Cham.
19. Jang, Y. J., Choi, G. H., & Kim, S. I. (2005, September). Modeling and analysis of stocker system in semiconductor and LCD fab. In ISSM 2005, IEEE International Symposium on Semiconductor Manufacturing, 2005. (pp. 273-276). IEEE.
20. Jin, M., & Wang, Y. (2017). Task Scheduling for Autonomous Shuttle and Stacker Crane Warehousing Systems. In IIE Annual Conference. Proceedings (pp. 970-975). Institute of Industrial and Systems Engineers (IISE).
21. Koo, P. H., Park, M. J., & Koh, S. G. (2016). Simulation analysis of operational control decisions in semiconductor wafer fabrication. In Proc. ICAOR (p. 102).
22. Kung, Y., Kobayashi, Y., Higashi, T., Sugi, M., & Ota, J. (2014). Order scheduling of multiple stacker cranes on common rails in an automated storage/retrieval system. International Journal of Production Research, 52(4), 1171-1187.
23. Lee, J. (1999). Dispatching rail-guided vehicles and scheduling jobs in a flexible manufacturing system. International journal of production research, 37(1), 111-123.
24. Lee, J., & Srisawat, T. (2006). Effect of manufacturing system constructs on pick-up and drop-off strategies of multiple-load AGVs. International journal of production research, 44(4), 653-673.
25. Li, Y., Jiang, Z., & Jia, W. (2014). An integrated release and dispatch policy for semiconductor wafer fabrication. International Journal of Production Research, 52(8), 2275-2292.
26. Lin, J. T., & Huang, C. J. (2014). A simulation-based optimization approach for a semiconductor photobay with automated material handling system. Simulation Modelling Practice and Theory, 46, 76-100.
27. Lin, J. T., Wang, F. K., & Chang, Y. M. (2006). A hybrid push/pull-dispatching rule for a photobay in a 300 mm wafer fab. Robotics and Computer-Integrated Manufacturing, 22(1), 47-55.
28. Lin, Y. H., Chiu, C. C., & Tsai, C. H. (2008). The study of applying ANP model to assess dispatching rules for wafer fabrication. Expert Systems with Applications, 34(3), 2148-2163.
29. Liu, H. C., & Yih, Y. (2013). A fuzzy-based approach to the liquid crystal injection scheduling problem in a TFT-LCD fab. International Journal of Production Research, 51(20), 6163-6181.
30. Luo, S. (2019, February). RGV optimal scheduling scheme selection in multi-process scenario. In AIP Conference Proceedings (Vol. 2073, No. 1, p. 020092). AIP Publishing.
31. Min, H. S., & Yih, Y. (2003). Selection of dispatching rules on multiple dispatching decision points in real-time scheduling of a semiconductor wafer fabrication system. International Journal of Production Research, 41(16), 3921-3941.
32. Mohamad, N. R., Fauadi, M. H. F. M., Zainudin, S. F., Noor, A. Z. M., Jafar, F. A., & Ali, M. M. (2018). Optimization of Material Transportation Assignment for Automated Guided Vehicle (AGV) System. International Journal of Engineering & Technology, 7(3.20), 334-338.
33. Morandin, O., Carida, V. F., Kato, E. R. R., & Fonseca, M. A. S. (2011, May). A hierarchical fuzzy rule-based building model applied to a AGV dispatching system in an FMS. In 2011 IEEE International Conference on Robotics and Automation (pp. 3764-3769). IEEE.
34. Muhamad, M. R., Fauadi, M. H. F. B. M., Jafar, F. A., Noor, A. Z. M., & Nordin, M. H. (2018). Simulation-Based Multi-Objective Optimization for Distributed Material Transportation System. International Journal of Engineering and Technology 7(3.20):92-94
35. Nishi, T., & Tanaka, Y. (2012). Petri net decomposition approach for dispatching and conflict-free routing of bidirectional automated guided vehicle systems. IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and Humans, 42(5), 1230-1243.
36. Qin, W., Zhang, J., & Sun, Y. (2013). Multiple-objective scheduling for interbay AMHS by using genetic-programming-based composite dispatching rules generator. Computers in Industry, 64(6), 694-707.
37. Rams, H., Schöberl, M., & Schlacher, K. (2018). Optimal Motion Planning and Energy-Based Control of a Single Mast Stacker Crane. IEEE Transactions on Control Systems Technology, 26(4), 1449-1457.
38. Salah, B., Janeh, O., Noche, B., Bruckmann, T., & Darmoul, S. (2017). Design and simulation based validation of the control architecture of a stacker crane based on an innovative wire-driven robot. Robotics and Computer-Integrated Manufacturing, 44, 117-128.
39. Sarin, S. C., Varadarajan, A., & Wang, L. (2011). A survey of dispatching rules for operational control in wafer fabrication. Production Planning and Control, 22(1), 4-24.
40. Shimizu, T., Suzuki, K., Naito, S., & Ito, S. (2009, August). Two-degree-of-freedom control of a stacker crane. In 2009 ICCAS-SICE (pp. 2480-2484). IEEE.
41. Singh, N., Dave, V., Kota, J., Singh, S. K., Sakrikar, R., & Sarngadharan, P. V. (2019). Modular Mission Control for Automated Material Handling System and Performance Analysis—A Case Study. In Machines, Mechanism and Robotics (pp. 329-340). Springer, Singapore.
42. Staudecker, M., Schlacher, K., & Hansl, R. (2008). Passivity based control and time optimal trajectory planning of a single mast stacker crane. IFAC Proceedings Volumes, 41(2), 875-880.
43. Su, T. S., & Hwang, M. H. (2017). Efficient machine layout design method with a fuzzy set theory within a bay in a TFT-LCD plant. Procedia Manufacturing, 11, 1863-1870.
44. Tseng, S. S., Chang, F. M., Chu, Y. S., & Chi, P. J. (2011). A GA-based method to reduce material handling: the case of TFT-LCD array Fabs in Taiwan. International Journal of Production Research, 49(22), 6691-6711.
45. Udhayakumar, P., & Kumanan, S. (2010). Task scheduling of AGV in FMS using non-traditional optimization techniques. International Journal of Simulation Modelling, 9(1), 28-39.
46. Wang, C. N., Lee, Y. H., Hsu, H. P., & Nguyen, D. H. (2016). The heuristic preemptive dispatching method for convey-based automated material handling system of 450 mm wafer fabrication. Computers & Industrial Engineering, 96, 52-60..
47. Wang, C. N., Wang, J. W., Chou, M. T., Liao, R. Y., & Huang, C. J. (2017). A dispatching method for the lots of different priorities in 450-mm semiconductor manufacturing. Advances in Mechanical Engineering, 9(7), 1687814017713945.
48. Wang, C., Fang, W., & Guan, Z. (2018). Simulation based Design for Materials Delivery System of Engineering Machinery Assembly Line. In 2018 7th International Conference on Sustainable Energy and Environment Engineering (ICSEEE 2018). Atlantis Press.
49. Wang, X., & Lu, J. (2010, November). Research on Control Method of Neural Network for Stacker Crane. In 2010 International Conference on E-Product E-Service and E-Entertainment (pp. 1-4). IEEE.
50. Wu, C. Q., Luo, J., Tang, H. G., Li, B., & Pan, Y. H. (2009, July). Cycle-deadlock control of RGV system via Petri net. In 2009 4th International Conference on Computer Science & Education (pp. 523-528). IEEE.
51. Wu, L. H., Mok, P. Y., & Zhang, J. (2011). An adaptive multi-parameter based dispatching strategy for single-loop interbay material handling systems. Computers in Industry, 62(2), 175-186.
52. Wu, L., Zhang, G., Sun, Y., & Zhang, J. (2010, October). A fuzzy logic-based and hybrid dispatching policy for interbay material handling system in 300mm semiconductor manufacturing system. In 2010 8th International Conference on Supply Chain Management and Information (pp. 1-6). IEEE.
53. Yang, T., Kuo, Y., Hsieh, C. H., & Ge, W. C. (2016). An exploratory study of virtual cell design for thin-film transistor–liquid crystal display (TFT-LCD) array manufacturing. The International Journal of Advanced Manufacturing Technology, 83(1-4), 633-644.
54. Yangl, Z., Li, C., & Zhao, Q. (2018, July). Dynamic Time Estimation Based AGV Dispatching Algorithm in Automated Container Terminal. In 2018 37th Chinese Control Conference (CCC) (pp. 7868-7873). IEEE.
55. Yao, S., Jiang, Z., Li, N., Geng, N., & Liu, X. (2011). A decentralised multi-objective scheduling methodology for semiconductor manufacturing. International Journal of Production Research, 49(24), 7227-7252.
56. Zhang, H., Jiang, Z., & Guo, C. (2009). Simulation-based optimization of dispatching rules for semiconductor wafer fabrication system scheduling by the response surface methodology. The International Journal of Advanced Manufacturing Technology, 41(1-2), 110-121.
57. Zhou, Q., & Zhou, B. H. (2016). A deadlock recovery strategy for unified automated material handling systems in 300 mm wafer fabrications. Computers in Industry, 75, 1-12.
|