中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 83776/83776 (100%)
Visitors : 59536831      Online Users : 870
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Electronic Thesis & Dissertation [785/785]
    journal & Dissertation [77/77]
    retired tests [179/179]

    Collection Statistics

    Item counts issued in 3 years: 6(6.12%)
    Items With Fulltext: 98(100.00%)

    Download counts of the item
    Download times greater than 0: 98(100.00%)
    Download times greater than 100: 95(96.94%)
    Total Bitstream Download Counts: 46500(6.84%)

    Last Update: 2025-11-20 14:33


    Top Upload

    Loading...

    Top Download

    Loading...

    RSS Feed RSS Feed
    Jump to a point in the index:
    Or type in a year:
    Ordering With Most Recent First Show Oldest First

    Showing items 1-10 of 98. (10 Page(s) Totally)
    1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    DateTitleAuthors
    2025-07-31 以分支定界法極小化具層級與雙目標之零工式排程問題;A Branch-And-Bound Algorithm for Solving a Job Shop Scheduling Problem with Layers and Dual Criteria 沈國基
    2025-07-31 應用預測分析的機器學習法於智慧運營:異常檢測、維護作業及需求預測;Developing Machine Learning Approaches for Predictive Analysis in Smart Operations with Applications in Anomaly Detection, Maintenance Operations, and Demand Forcasting 陳振明
    2024-09-27 延伸NSGA-II方法以求解具平行批次處理與物料分派之極小化Makespan與加權物料浪費雙目標之彈性零工式排程問題;An Extension of Nsga-Ii Approach for Flexible Job Shop with Parallel Batching and Material Assignment When Minimizing Makespan and Total Weighted Material-Wasted 沈國基
    2024-09-27 發展數據驅動AI賦能之預測性分析於異常診斷、設備維護及運營預測;Developing Data-Driven Ai-Enabled Predictive Analyses for Anomaly Diagnostic, Equipment Maintenance, and Operational Prediction 陳振明
    2023-07-17 以NSGA-II方法求解具批次與物料消耗限制之雙目標彈性零工式排程問題;Nsga-Ii Approach for Flexible Job Shop with Batching and Material Consumption When Minimizing the Number of Tardy Stage-Outs and Makespan 沈國基
    2023-07-17 發展數據驅動AI賦能之預測性分析於異常診斷、設備維護及運營預測;Developing Data-Driven Ai-Enabled Predictive Analyses for Anomaly Diagnostic, Equipment Maintenance, and Operational Prediction 陳振明
    2022-07-26 機械設備製造廠之加工位置佈置與排程控制問題的探討;A Study on the Processing Location Layout and Schedule Control Problems in a Machinery Equipment Manufacturer 何應欽
    2022-07-26 以極小化Makespan與Tardy stage-outs雙目標之零工式排程問題;A Bi-Objective Optimization for Job Shop Scheduling Problem Minimizing Both Makespan and Number of Tardy Stage-Outs 國立中央大學大氣科學學系
    2021-12-21 發展數據驅動之異常診斷與預測性維護策略—以塗佈機鍍膜製程為例;Developing a Data-Driven Anomaly Diagnostic and Predictive Maintenance Strategy for Coating Machines 陳振明
    2020-12-08 具機台合適度決定與時間窗口限制之平行批次處理問題;Parallel Batch Processing Problem with Machine Eligibility Determination and Time Window Constraint 沈國基

    Showing items 1-10 of 98. (10 Page(s) Totally)
    1 2 3 4 5 6 7 8 9 10 > >>
    View [10|25|50] records per page

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明