    題名: 建築工程自動化S進度曲線輔助系統 開發與應用之研究;An S-Curve Support System for Architecture Construction Projects
    作者: 鄒寶億;Pao-Yi, Tsou
    貢獻者: 土木系營建管理碩士班
    關鍵詞: S進度曲線;自動化;時程管理;排程軟體;S-Curve;Automation;Schedule Management;Scheduling Software
    日期: 2025-06-11
    上傳時間: 2025-10-17 11:01:01 (UTC+8)
    出版者: 國立中央大學
    摘要: 國內每年執行的工程專案數量眾多,時程管理是確保專案如期完成的重要工具之一。工程會於2013年頒布「01103 進度管理」綱要規範,內容並包含S進度曲線(S-Curve)的繪製與更新。然該綱要規範僅進行文字性規定,除非業主有明確規定,否則廠商還是會以自己有利的方式繪製S進度曲線。導致其成果除無法有效用於專案進度控管外,亦經常在履約爭議中無法提供有效的作用。本研究旨在開發S進度曲線輔助系統,以利解決S進度曲線實務應用中所面臨之問題。本研究首先彙整S進度曲線相關資訊,並釐清其使用專業排程軟體與Excel試算表之繪製流程,以建構本研究之自動化S進度曲線輔助系統之架構與系統。本研究所建立之系統可自動化產出S進度曲線,使用者可透過此系統提高作業效率、降低人工繪製S進度曲線發生之出錯率。此外,本研究也建構S進度曲線更新自動化輔助系統,使用者在輸入專案延宕資訊後,可自動化產出四種不同更新方式之S進度曲線,提供承包商於專案進行過程中,對S進度曲線進行快速更新並再利用於後續的時程管控。期望透過本研究建立之輔助系統可提升國內善用S進度曲線,進而改善專案管控之水準。;In Taiwan, a large number of construction projects are executed each year, and schedule management is one of the key tools to ensure projects are completed on-time. In 2013, the Public Construction Commission released the guideline "01103 Schedule Management" , which includes provisions for the creation and updating of S-Curves. However, the guideline only contains textual regulations; unless explicitly specified by the client, contractors often create S-Curves in their favorable ways. As a result, these curves are not effective for project schedule control and often fail to provide meaningful support in disputes resolution. This study aims to develop an S-Curve support system to address the practical challenges associated with applying S-Curves. First, this study compiles information related to S-Curves and clarifies the process of generating them using professional scheduling software and Excel spreadsheets. Based on this, the framework and system for an automated S-Curve support tool are established. The system developed in this study can automatically generate S-Curves, allowing users to improve work efficiency and reduce errors caused by manual creation. Additionally, the study introduces an automated system for updating S-Curves. After users input project delay information, the system can automatically generate four different types of updated S-Curves. This enables contractors to quickly revise and reuse the curves for ongoing schedule control during project execution. The proposed system is expected to enhance the overall effectiveness of S-Curve implementation and promote better schedule management practices in Taiwan′s construction industry.
    顯示於類別:[營建管理研究所 ] 博碩士論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML6檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明