English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 94201/94201 (100%)
造訪人次 : 81546378      線上人數 : 3769
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: https://ir.lib.ncu.edu.tw/handle/987654321/99678


    題名: Critical path effect based delay analysis method for construction projects
    作者: 楊智斌;Yang, Jyh-Bin;Kao, Chih-Kuei
    貢獻者: 工學院土木工程學系
    關鍵詞: Bauwirtschaft;Claim;Comparative analysis;Construction;Construction industry;Construction project;Critical path;Delay;Delay analysis;Effectiveness studies;Liability;Methods;Project management;Projection;Projektmanagement;Schedule analysis;Schedules;Scheduling-Verfahren;Software;Subjective assessment;Warteschlangentheorie;Windows (computer programs)
    日期: 2012-04-01
    上傳時間: 2026-04-21 13:27:06 (UTC+8)
    出版者: Elsevier BV;Kidlington: Elsevier Ltd
    摘要: 摘要: Assessing schedule delay's impact on total project duration to distribute delay liability remains a controversy. None of existing delay analysis methods is perfect because including an element of assumptions, subjective assessment and theoretical projection. Windows-based delay analysis methods are excellent in identifying and measuring construction schedule delays. Based on a previous study identifying potential problems in available windows-based delay analysis methods, this study proposes an innovative windows-based delay analysis method, called the effect-based delay analysis method (the EDAM method). The EDAM method performs delay analysis using extracted windows and determines delay impacts by considering the effects of delays on the critical path(s). According to its application to hypothetical cases and comparisons with other methods, the EDAM method is efficient in delay analysis and effective in solving concurrent delays and determining schedule shortened. The proposed EDAM method is a good alternative for schedule delay analysis for construction projects. ► EDAM method considers critical path effects in delay analysis. ► EDAM method has a systematic approach for delay analysis stably and efficiently. ► EDAM method is effective in determining concurrent delays and schedule shortened. ► EDAM method has an approach for liability distribution in concurrent delays.
    出版者: Kidlington: Elsevier Ltd
    出版日期: 2012-04-01
    出處: International journal of project management, 2012-04, Vol.30 (3), p.385-397
    資源來源: Elsevier ScienceDirect Journals Complete
    版權: 2011 Elsevier Ltd and IPMA
    版權: Copyright Elsevier Science Ltd. Apr 2012
    識別號: ISSN: 0263-7863
    識別號: EISSN: 1873-4634
    識別號: DOI: 10.1016/j.ijproman.2011.06.003
    顯示於類別:[土木工程學系 ] 期刊論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML10檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明