English
| 正體中文 |
简体中文
|
全文筆數/總筆數 : 94201/94201 (100%)
造訪人次 : 81699050 線上人數 : 3465
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by
NTU Library IR team.
搜尋範圍
全部NCUIR
工學院
土木工程學系
--期刊論文
查詢小技巧:
您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
進階搜尋
主頁
‧
登入
‧
上傳
‧
說明
‧
關於NCUIR
‧
管理
NCU Institutional Repository
>
工學院
>
土木工程學系
>
期刊論文
>
Item 987654321/99845
資料載入中.....
書目資料匯出
Endnote RIS 格式資料匯出
Bibtex 格式資料匯出
引文資訊
資料載入中.....
資料載入中.....
請使用永久網址來引用或連結此文件:
https://ir.lib.ncu.edu.tw/handle/987654321/99845
題名:
Developing computer-based schedule delay analysis methods based on information flow analysis: A case study
作者:
姚乃嘉
;
Tsai, Ming-Kuan
;
Yang, Jyh-Bin
;
Yau, Nie-Jia
貢獻者:
工學院土木工程學系
關鍵詞:
analytical techniques
;
claims management
;
Classification
;
Construction
;
construction dispute
;
Delay
;
Engineering research
;
Information flow
;
Information theory
;
Liability
;
Management
;
programming technique
;
Project management
;
project management software
;
schedule delay
;
Schedules
;
Scheduling (Management)
日期:
2013-12-01
上傳時間:
2026-04-21 13:37:55 (UTC+8)
出版者:
Vilnius Gediminas Technical University;Taylor & Francis
摘要:
摘要: Schedule analysts often resolve diverse schedule delay problems in construction projects based on their subjective experiences. Although various process-based and mathematical-model schedule delay analysis methods are available for effective schedule delay analysis, these methods require time-consuming manual operation. The use of computer-based schedule delay analysis methods seems to be a solution. However, schedule analysts still have difficulty developing computer-based schedule delay analysis methods. Therefore, this study applies information flow analysis to classify the necessary work to develop computer-based schedule delay analysis methods. In contrast to numerous studies that focus only on computerizing a process-based or a mathematical-model schedule delay analysis method, this study constructs a computer-based method that integrates two process-based schedule delay analysis methods simultaneously. In a tested case study, the delay liability for the project owner and contractor was classified successfully. Importantly, this study provides a useful reference for similar applications in project management.
其他題名: JCEM
出版者: Taylor & Francis
出版日期: 2013-12-01
出處: Journal of civil engineering and management, 2013-12, Vol.19 (6), p.823-835
資源來源: DOAJ Directory of Open Access Journals
版權: Copyright © 2013 Vilnius Gediminas Technical University (VGTU) Press 2013
版權: Copyright (c) 2013 The Author(s). Published by Vilnius Gediminas Technical University.
版權: COPYRIGHT 2013 Vilnius Gediminas Technical University
識別號: ISSN: 1392-3730
識別號: ISSN: 1822-3605
識別號: EISSN: 1822-3605
識別號: DOI: 10.3846/13923730.2013.801901
顯示於類別:
[土木工程學系 ] 期刊論文
文件中的檔案:
檔案
描述
大小
格式
瀏覽次數
index.html
0Kb
HTML
11
檢視/開啟
在NCUIR中所有的資料項目都受到原著作權保護.
社群 sharing
::: Copyright National Central University. | 國立中央大學圖書館版權所有 |
收藏本站
|
設為首頁
| 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
DSpace Software
Copyright © 2002-2004
MIT
&
Hewlett-Packard
/
Enhanced by
NTU Library IR team
Copyright ©
-
隱私權政策聲明