English  |  正體中文  |  简体中文  |  Items with full text/Total items : 68069/68069 (100%)
Visitors : 23168812      Online Users : 204
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://ir.lib.ncu.edu.tw/handle/987654321/29635


    Title: RELIABILITY BOUNDS AND CRITICAL TIME FOR THE BIRNBAUM-SAUNDERS DISTRIBUTION
    Authors: CHANG,DS;TANG,LC
    Contributors: 企業管理研究所
    Date: 1993
    Issue Date: 2010-06-29 20:33:33 (UTC+8)
    Publisher: 中央大學
    Abstract: The Birnbaum-Saunders distribution, under certain conditions, can be used to model the fatigue failure-time caused by catastrophic crack size. This paper obtains: reliability bounds for the Birnbaum-Saunders distribution, point & interval estimates for the critical time of the failure (hazard)-rate. The confidence intervals are constructed under the assumption that both parameters are unknown. This method is not affected by censoring, as long as confidence intervals for the parameters can be established. Numerical examples illustrate the procedure.
    Relation: IEEE TRANSACTIONS ON RELIABILITY
    Appears in Collections:[企業管理研究所] 期刊論文

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML453View/Open


    All items in NCUIR are protected by copyright, with all rights reserved.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback  - 隱私權政策聲明