中大機構典藏-NCU Institutional Repository-提供博碩士論文、考古題、期刊論文、研究計畫等下載:Item 987654321/64732
English  |  正體中文  |  简体中文  |  全文筆數/總筆數 : 80990/80990 (100%)
造訪人次 : 41652075      線上人數 : 1663
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜尋範圍 查詢小技巧:
  • 您可在西文檢索詞彙前後加上"雙引號",以獲取較精準的檢索結果
  • 若欲以作者姓名搜尋,建議至進階搜尋限定作者欄位,可獲得較完整資料
  • 進階搜尋


    請使用永久網址來引用或連結此文件: http://ir.lib.ncu.edu.tw/handle/987654321/64732


    題名: 團隊教練、團隊績效流程、團隊效能、團隊設計、組織限制之關聯性探討;The Relationships among Team Coaching, Team Performance Process, Team Effectiveness, Team Design and Organizational Constraints
    作者: 王曉如;Wang,Hsiao-ju
    貢獻者: 人力資源管理研究所
    關鍵詞: 團隊教練;團隊績效流程;團隊效能;團隊設計;組織限制;工研院;Team Coaching;Team Performance Process;Team Effectiveness;Team Design;Organizational Constraints;ITRI
    日期: 2014-07-16
    上傳時間: 2014-10-15 14:21:51 (UTC+8)
    出版者: 國立中央大學
    摘要: 本研究目的為驗證Hackman & Wageman (2005)提出的團隊教練理論,該理論認為團隊績效流程在團隊教練與團隊效能的關係中扮演中介角色,而團隊設計與組織限制在這三者的關係中具有調節效果。本研究的樣本來源為工研院的110組專案團隊。經由迴歸分析的結果顯示,一、團隊教練正向影響團隊績效流程與其三個子流程(努力、策略、知識與技術);二、團隊績效流程與其三個子流程對團隊效能有正向影響;三、團隊績效流程與其三個子流程皆部分中介團隊教練與團隊效能間的關係。
    然而,由於工研院的專案團隊所身處的環境,團隊設計在團隊教練與團隊績效流程的關係中不具有顯著的調節效果;組織限制在團隊績效流程與團隊效能的關係中也不具有顯著的調節效果。
    本研究建議專案經理可以藉由展現團隊教練的行為來改善團隊運作的過程並提升團隊效能。尤其當其環境類似於工研院,所受到的組織限制較小,並且專案團隊形成的模式也類似於工研院時,專案經理較不需花費心力於組織限制與團隊設計上,因此更能專注於展現團隊教練行為。此時團隊教練行為更能發揮其功效,改善與提升團隊運作過程與團隊效能。
    ;The purpose of this study was to examine the theory of team coaching which is the mediating effect of team performance process on the relationship between team coaching and team effectiveness, moderated by team design and organizational constraints (Hackman & Wageman, 2005). 110 valid project team samples were taken from ITRI. Regression analysis results showed that (1) team coaching significantly positively influenced team performance process and its three sub-processes (effort, strategy, and knowledge and skill), (2) team performance process and its three sub-processes significantly positively impacted on team effectiveness, and (3) team performance process and its three sub-processes partially mediated the relationship of team coaching and team effectiveness.
    However, under the condition of ITRI’s project teams, the moderating effects of team design and organizational constraints were not proved to have effects on the relationship of team coaching and team performance process and the relationship of team performance process and team effectiveness respectively.
    Implications suggested that project managers could enhance team effectiveness and team performance process by facilitating team coaching especially when there are little organizational constraints imposed on project teams and when the pattern of project team design was similar with ITRI.
    顯示於類別:[人力資源管理研究所] 博碩士論文

    文件中的檔案:

    檔案 描述 大小格式瀏覽次數
    index.html0KbHTML751檢視/開啟


    在NCUIR中所有的資料項目都受到原著作權保護.

    社群 sharing

    ::: Copyright National Central University. | 國立中央大學圖書館版權所有 | 收藏本站 | 設為首頁 | 最佳瀏覽畫面: 1024*768 | 建站日期:8-24-2009 :::
    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 隱私權政策聲明